Chapter 2
Wiring & Connections
Note
This chapter provides wiring details for fieldbus operation. It is
assumed that the instrument has already been installed (refer to the
LevelPRO installation guide).
▲
The fieldbus connector is accessible from the faceplate of the LevelPRO.
Figure 2–1.
Signals on the LevelPRO
F
OUNDATION
fieldbus
connector
The only connections required for operation are to the H1 bus.
Table 2–1.
H1 bus to LevelPRO fieldbus connector
H1 Bus
LevelPRO Fieldbus Connector
Positive lead
FF+
Negative lead
FF-
Thermo Fisher Scientific
LevelPRO with
F
OUNDATION
™ fieldbus
Application Guide
2-1
Содержание LevelPRO Series
Страница 2: ......
Страница 3: ...LevelPRO With FOUNDATION TM Fieldbus Application Guide P N 717915 Revision A ...
Страница 4: ......
Страница 6: ...This page intentionally left blank ...
Страница 8: ...This page intentionally left blank ...
Страница 54: ...This page intentionally left blank ...
Страница 64: ...This page intentionally left blank ...
Страница 70: ...This page intentionally left blank ...
Страница 94: ...This page intentionally left blank ...
Страница 98: ...This page intentionally left blank ...