![Thermo Scientific HB-S2000 Скачать руководство пользователя страница 39](http://html.mh-extra.com/html/thermo-scientific/hb-s2000/hb-s2000_user-manual_1105188039.webp)
Sarasota 2000 Ultrasonic Multipath
Flowmeter
Section 4 INSTALLATION Page 4-1
Thermo Fisher Scientific
INSTALLATION
4 INSTALLATION
4.1 Safety
SAFETY NOTICE
The installation of the Thermo Scientific Sarasota 2000
flowmeter may involve a number of steps which require
special skills, training and special equipment. Examples
include:
•
Electrical installation
•
Working on construction sites
•
Working near water (may be deep or fast flowing)
•
Lifting equipment
•
Working at height
•
Working from boats
•
Confined space working
It is recommended that prior to the installation the installer
should write a method statement detailing:
•
The scope and purpose of the work,
•
The steps in the operation,
•
Interaction with others,
•
The personnel to be involved,
•
Their qualifications for the work,
•
Protective clothing and equipment,
•
Machinery, tools etc.
•
Emergency contacts and procedures.
A risk assessment should be carried out and both the
method statement and risk assessment should be
approved by the person responsible for Health and Safety
on the site.
Thermo Fisher Scientific accepts no responsibility for the
safety of personnel other than its own employees in the
installation and commissioning of the Sarasota 2000
flowmeter and accessories supplied.
Содержание HB-S2000
Страница 2: ......
Страница 3: ...Sarasota 2000 Ultrasonic Multipath Flowmeter User Guide P N HB S2000 Revision A ...
Страница 4: ......
Страница 6: ...This page intentionally left blank ...
Страница 10: ...Sarasota 2000 Ultrasonic Multipath Flowmeter INDEX Page 4 Thermo Fisher Scientific INDEX This page is blank ...