Wiring
Power Connections
To connect the power for 120 Vac operation:
120 Vac Operation
1.
Connect the
hot wire to the L1(+)
terminal.
2.
Connect the
neutral wire to the L2/N(-)
terminal.
3.
Connect the
ground wire to the GND
terminal.
Single Phase 240
Vac Operation
To connect the power for single phase 240 Vac operation:
1.
Connect the
live wire to the L1(+)
terminal.
2.
Connect the
neutral wire to the L2/N(-)
terminal.
3.
Connect the
ground wire to the GND
terminal.
Double Phase 240
Vac Operation
To connect the power for double phase 240 Vac operation:
1.
Connect the
one hot wire to the L1(+)
terminal.
2.
Connect the
other hot wire to the L2/N(-)
terminal.
3.
Connect the
ground wire to the GND
terminal.
12 to 24 Vdc
Operation
Note
For DC operation, set the 4 –20 mA current loop function to loop
powered mode to prevent ground loops.
▲
To connect the power for 12 to 24 Vdc operation:
4.
Connect the
positive wire to the L1(+)
terminal.
5.
Connect the
negative wire to the L2/N(-)
terminal.
Thermo Fisher Scientific
DCT6088 User Guide
3-3
Содержание DCT6088
Страница 2: ......
Страница 3: ...DCT6088 Dedicated Transit Time Flowmeter User Guide P N 1 0561 006 Revision J ...
Страница 4: ......
Страница 6: ...This page intentionally left blank ...
Страница 8: ...This page intentionally left blank ...
Страница 12: ...This page intentionally left blank ...
Страница 20: ...This page intentionally left blank ...
Страница 78: ...This page intentionally left blank ...
Страница 94: ...This page intentionally left blank ...
Страница 97: ...Pipe Schedules Table A 2 Cast iron pipe standard classes Thermo Fisher Scientific DCT6088 User Guide A 3 ...
Страница 98: ...Pipe Schedules A 4 DCT6088 User Guide Thermo Fisher Scientific Table A 3 Ductile iron pipe standard classes ...
Страница 118: ...This page intentionally left blank ...
Страница 120: ...This page intentionally left blank ...