Installation and setup
Packaging contents
• Rotea
™
instrument
• Hanger posts (2 off)
• Mains plug IEC cables (USA/EUROPE/AUSTRALIA)
• Pre-fitted mains fuses (2 x 5A)
• USB-C (male) to USB-C (female)
• Dell
™
2
‑
in
‑
1 laptop tablet (this will be in a separate carton)
Instrument installation
• Remove outer packaging
• Prepare bench space to receive Rotea
™
instrument unit (see “Working space”
ensuring
that there is easy access to the “On/Off” switch and mains IEC connector at the rear of the
instrument
CAUTION!
The Rotea
™
instrument should be installed on a stable bench. If a mobile set up is used,
it is the user’s responsibility to ensure all safety hazards and functional risks are addressed including
adequately supporting the weight of the instrument and having sufficient wheel span so that both the
trolley and instrument are stable.
• Ensure that the bench is stable and level to within ±0.4" (10 mm)
• Position the instrument on the bench with a minimum of 4" (10 m) between the rubber feet and the
edges of the bench
CAUTION!
The Rotea
™
instrument weighs 40 lbs (18 kg) excluding hanger bag posts. Use
appropriate care and seek assistance if necessary when lifting or moving the instrument. Lift the
instrument, holding between the rubber feet on the bottom of the instrument.
CAUTION!
Do not position the instrument is such a way that it would make it difficult to disconnect
the power cord from the power inlet.
CAUTION!
If using an alternate mains cable, ensure it is rated for at least 10A.
2
16
CTS
™
Rotea
™
Counterflow Centrifugation System User Guide
Содержание A44769
Страница 131: ......