Engine Maintenance (Rev. 04/03)
76
ADJUST ENGINE VALVE CLEARANCE
1.
Remove the valve cover. Torque 18 mm diameter head
bolts prior to adjusting the valves: 26.8 ft-lb
(36.3 N•m). Valve clearance should be checked every
2000 operating hours, maximum. It is very important
that valves be adjusted to the correct specifications for
satisfactory engine operation. Insufficient valve clear-
ance will result in compression loss and misfiring of
cylinders resulting in burned valves and seats. Exces-
sive valve clearance will result in noisy valve operation
and abnormal wear of the valves and rocker arms. The
intake and exhaust valves are adjusted with the valve in
the closed position.
2.
The intake valve and exhaust valve are adjusted to
0.0079 in. (0.20 mm) with the temperature at 70 F
(21 C).
Turn the engine by using the belt on the crankshaft pul-
ley. Rotate the engine in the direction of rotation
(clockwise as viewed next to the flywheel) from the
water pump end.
CAUTION: Make sure the fuel rack is off to
prevent the engine from starting.
a.
Turn the engine so number 1 cylinder is on com-
pression with piston to TDC. Both push rods
should turn freely. Adjust both valves on number 1
cylinder.
b.
Revolve the crankshaft 240° to TDC mark on num-
ber 3 cylinder, and adjust both valves.
c.
Turn the crankshaft 240° to align TDC mark of
number 2 cylinder, and adjust both valves.
d.
BE SURE to tighten locking nut while holding the
ball head screw in position.
3.
Install the valve cover making sure that the gasket in
position.
FUEL LIMIT SCREW
The fuel limit screw is not adjustable. It is equipped with an
anti-tamper cap to fulfill requirements for CARB (Califor-
nia Air Resources Board) emission regulations. Service
technicians must be CARB certified to perform service on
fuel limit screw for equipment operating in California. All
other equipment can be serviced per recent service bulletins
with special tools and procedures. California service techni-
cians should see your local Thermo King dealer for recent
bulletins.
Содержание KD-II SR
Страница 4: ......
Страница 8: ......
Страница 13: ...Safety Precautions Rev 04 03 v AEA40...
Страница 14: ...Safety Precautions Rev 04 03 vi AEA38...
Страница 33: ...Unit Description Rev 04 03 19 1 Evaporator 2 Access Door Rear View Curbside KD II SR 1 2 AEA38...
Страница 37: ...Unit Description Rev 04 03 23 Power Receptacle Box KD II SR 50 AEA42...
Страница 38: ...Unit Description Rev 04 03 24 1 Keypad 2 LED Display THERMOGUARD Remote Control Panel AEA43 1 2...
Страница 42: ...P T System Description Rev 04 03 28 High Voltage Tray No Options High Voltage Tray with Phase Correction...
Страница 44: ...P T System Description Rev 04 03 30 High Voltage Tray with Single Phase Power and Electric Heater...
Страница 58: ...Remote Control Panel Features Rev 04 03 44...
Страница 112: ...Refrigeration Maintenance Rev 04 03 98...
Страница 120: ...106...
Страница 146: ...132...
Страница 156: ...142...
Страница 162: ...148...
Страница 170: ...156...
Страница 172: ...158...
Страница 173: ...159 KD II 30 Schematic Diagram Page 1 of 2...
Страница 174: ...160 KD II 30 Schematic Diagram Page 2 of 2...
Страница 175: ...161 KD II 30 Wiring Diagram Page 1 of 2...
Страница 176: ...162 KD II 30 Wiring Diagram Page 2 of 2...
Страница 177: ...163 KD II 50 Schematic Diagram Page 1 of 2...
Страница 178: ...164 KD II 50 Schematic Diagram Page 2 of 2...
Страница 179: ...165 KD II 50 Wiring Diagram Page 1 of 2...
Страница 180: ...166 KD II 50 Wiring Diagram Page 2 of 2...
Страница 181: ...167 KD II 50 SR 230 1 60 Wiring Diagram Page 1 of 2...
Страница 182: ...168 KD II 50 SR 230 1 60 Wiring Diagram Page 2 of 2...