DVOR 432
Operation and Maintenance
Installation
2-9
Ed. 01.04
2.4.2.3
Installation of the Sideband Antennas
First install antenna 1. The installation point of this antenna should be selected with the aid of a comĆ
pass such that it is aligned approximately with North with respect to the middle antenna (Fig. 2-10).
Mark the installation point on the antenna ring. Install vertical pipe 1 here, and align it perpendicularly
with the aid of a spirit level (if necessary compensate by means of washers or similar). The vertical
pipe should be installed such that the installation hole for the decoupling module is on the left as seen
from the middle antenna. Secure the vertical pipe to the antenna ring by means of a clamping plate
and 2 screws (Fig. 2-11). Secure all vertical pipe fastenings to the outer ring (Fig. 2-10).
1
2
Antenna ring
3
4
5
6
50
51
North
Antenna ring
vertical pipes
outer ring
Fig. 2-10
Installation of vertical pipes and installation point of antenna 1
1
2
3
4
5
1 Holes for measurement probe
2 Antenna dome
3 Antenna ring
4 Position of middle antenna
5 Installation hole in vertical pipe
6 Clamping plate
7 Screws
6
7
Fig. 2-11
Installation direction of vertical pipe and antenna dome
Содержание DVOR 432
Страница 2: ......
Страница 4: ......
Страница 16: ...DVOR 432 Table of Contents Operation and Maintenance X Ed 01 04 ...
Страница 38: ...DVOR 432 General Information Operation and Maintenance 1 6 Ed 01 04 ...
Страница 40: ...DVOR 432 General Information Operation and Maintenance 1 8 Ed 01 04 ...
Страница 46: ......
Страница 66: ...DVOR 432 Installation Operation and Maintenance 2 24 Ed 01 04 ...
Страница 74: ......
Страница 136: ...DVOR 432 Installation Operation and Maintenance 4 32 Ed 01 04 ...
Страница 172: ...DVOR 432 Repairs Operation and Maintenance 6 22 Ed 01 04 ...
Страница 186: ...DVOR 432 Repairs Operation and Maintenance 6 36 Ed 01 04 ...
Страница 192: ...DVOR 432 Installation Operation and Maintenance Annex Nextfield AN 4 Ed 01 04 ...
Страница 194: ......
Страница 195: ...DVOR 432 Operation and Maintenance Annex Nextfield L 1 Ed 01 04 CHAPTER 2 CHAPTER 3 For Chapter numbering only ...
Страница 196: ...DVOR 432 General Operation and Maintenance Annex Nextfield L 2 Ed 01 04 ...
Страница 204: ...DVOR 432 Alignment Procedure Operation and Maintenance Annex Nextfield AN 14 Ed 01 04 ...
Страница 234: ...DVOR 432 Maintenance Operation and Maintenance Annex Nextfield AN 44 Ed 01 04 ...