General
See Fig. 2-4.
The Navaids equipment can be supplied already installed in a 10 ft Standard Shelter (type 1D) which
is offered by Thales ATM. To cover the requirements the shelter is based on the definition on transport
containers ISO/DIN standards. The shelter consists of a self-supporting, distortion resistant steel
frame construction with eight ISO corners and walls made of sandwich panels in standardized conĆ
tainer dimensions.
During installation, the shelter should be placed on the foundations such that the door is oriented
according to the site survey and project drawings. The shelter is anchored to the four foundation
blocks using the ISO corners and twist locks. The power supply (mains) and signal (RC, field monitor)
feeder cables enter frombelow through openings in the shelter floor.
2991
(Dimensions in mm; Tare weight approx. 900 kg)
2438
2438
Support for A/C
for DVOR antenna
connections
Lead through used
Fig. 2-4
10 ft DVOR container shelter
2.3.2
Transportation and Installation of the Container Shelter
See Fig. 2-5.
When transporting by crane or helicopter, care should be taken to ensure that the angle between the
lifting harness and the crate is at least 60°.
min. 60°
Fig. 2-5
Correct lifting with a lifting harness
Содержание DVOR 432
Страница 2: ......
Страница 4: ......
Страница 16: ...DVOR 432 Table of Contents Operation and Maintenance X Ed 01 04 ...
Страница 38: ...DVOR 432 General Information Operation and Maintenance 1 6 Ed 01 04 ...
Страница 40: ...DVOR 432 General Information Operation and Maintenance 1 8 Ed 01 04 ...
Страница 46: ......
Страница 66: ...DVOR 432 Installation Operation and Maintenance 2 24 Ed 01 04 ...
Страница 74: ......
Страница 136: ...DVOR 432 Installation Operation and Maintenance 4 32 Ed 01 04 ...
Страница 172: ...DVOR 432 Repairs Operation and Maintenance 6 22 Ed 01 04 ...
Страница 186: ...DVOR 432 Repairs Operation and Maintenance 6 36 Ed 01 04 ...
Страница 192: ...DVOR 432 Installation Operation and Maintenance Annex Nextfield AN 4 Ed 01 04 ...
Страница 194: ......
Страница 195: ...DVOR 432 Operation and Maintenance Annex Nextfield L 1 Ed 01 04 CHAPTER 2 CHAPTER 3 For Chapter numbering only ...
Страница 196: ...DVOR 432 General Operation and Maintenance Annex Nextfield L 2 Ed 01 04 ...
Страница 204: ...DVOR 432 Alignment Procedure Operation and Maintenance Annex Nextfield AN 14 Ed 01 04 ...
Страница 234: ...DVOR 432 Maintenance Operation and Maintenance Annex Nextfield AN 44 Ed 01 04 ...