BHT-206A/B-SERIES-MM-1
5-00-00
Page 122
Rev. 14 30 APR 2013
Export Classification C, ECCN EAR99
MOD 5: Fifth line of data plate. Longer magnetic drain plug
B-148 or chip detector B-3228 (refer to AL 206A-58 or
SL 206A-133).
TRANSMISSION (206-040-002-005)
SUN GEAR AND PINION BEARINGS
Chapter 63
1.
Remove transmission.
BHT-206A/B-M&O
2.
Remove top case. Mast assembly may be left attached to
top case unless top case is to be inspected.
CAUTION
H A N D L E P L A N E T A R Y A S S E M B L Y W I T H
CAUTION TO AVOID TILTING OF PLANET GEARS
AND SPILLING OF SPHERICAL ROLLERS. IF
PLANET ASSEMBLY BECOMES TILTED, DO NO
FORCE TO STRAIGHTEN; ROTATE PLANET
GENTLY TO STRAIGHTEN. IF PLANET WILL NOT
TURN FREELY, ONE OR MORE ROLLERS MAY
HAVE SHIFTED FROM PROPER POSITION;
PRESS ROLLERS TOWARD CENTER OF PLANET
WITH FINGERS TO FREE ASSEMBLY. (FORCING
ASSEMBLY TO STRAIGHTEN CAN BRINNEL THE
INNER RACE.)
3.
Remove internal planetary gear.
BHT-206A/B-M&O
4.
Remove planetary assembly and sun gear as one
assembly. Inspect planetary assembly.
a.
Inspect sun gear as follows:
(1)
Visually inspect for general condition.
(2)
Perform over pins dimensional inspection.
SCHEDULED INSPECTIONS
5-37.
600 HOURS OF COMPONENT OPERATION (CONT)
DATA REFERENCE
INSPECTION TASK DESCRIPTION
INITIAL
MECH OTHER
Содержание Bell 206A Series
Страница 10: ......
Страница 16: ......
Страница 20: ......
Страница 34: ......
Страница 40: ......
Страница 48: ......
Страница 66: ......
Страница 80: ......
Страница 86: ......
Страница 94: ......
Страница 102: ......
Страница 116: ......
Страница 122: ......
Страница 124: ......
Страница 138: ......
Страница 142: ......
Страница 144: ......
Страница 150: ......
Страница 162: ......
Страница 166: ......
Страница 168: ......
Страница 178: ......
Страница 180: ......
Страница 186: ......
Страница 192: ......
Страница 198: ......
Страница 202: ......
Страница 206: ......
Страница 212: ......
Страница 228: ......
Страница 230: ......