BHT-206A/B-SERIES-MM-1
5-00-00
Export Classification C, ECCN EAR99
2.
Remove battery and recondition in accordance with
BHT-ALL-SPM and manufacturer’s service manual.
3.
Examine battery vent tubes for obstruction or damage.
4.
Perform operational check of the battery temperature
sensing system.
5.
If battery was removed, clean mounting area prior to
installing serviceable battery.
6.
Verify operation of landing lights.
7.
Verify operation of lower fuselage mounted position lights,
if installed.
8.
Examine antennas for condition and security.
GROUND RUN
CAUTION
G R O U N D R U N O F H E L I C O P T E R T O B E
ACCOMPLISHED BY QUALIFIED PERSONNEL
ONLY.
Chapter 12
1.
Make sure applicable servicing requirements have been
carried out.
2.
Check oil level of transmission, hydraulic tank, engine, and
tail rotor gearbox prior to running helicopter.
3.
Make sure that helicopter is ready for ground run and that
surrounding area is clear.
BHT-206A-FM-1,
BHT-206B-FM-1,
BHT-206B3-FM-1
4.
Start the helicopter and conduct ground run at 100% N
R
to
check for leaks, and ensure all systems are operational, and
parameters are within Flight Manual limitations.
5.
Shut down the helicopter.
PROGRESSIVE INSPECTIONS
5-25.
300-HOUR AIRFRAME PROGRESSIVE INSPECTION — EVENT NO. 5 (CONT)
DATA REFERENCE
INSPECTION TASK DESCRIPTION
INITIAL
MECH OTHER
2 JUN 2015 Rev. 15
Page 85/86
Содержание Bell 206A Series
Страница 10: ......
Страница 16: ......
Страница 20: ......
Страница 34: ......
Страница 40: ......
Страница 48: ......
Страница 66: ......
Страница 80: ......
Страница 86: ......
Страница 94: ......
Страница 102: ......
Страница 116: ......
Страница 122: ......
Страница 124: ......
Страница 138: ......
Страница 142: ......
Страница 144: ......
Страница 150: ......
Страница 162: ......
Страница 166: ......
Страница 168: ......
Страница 178: ......
Страница 180: ......
Страница 186: ......
Страница 192: ......
Страница 198: ......
Страница 202: ......
Страница 206: ......
Страница 212: ......
Страница 228: ......
Страница 230: ......