FF711BG
7-4
Tetra Pak
Hoyer
1
2
4
3
5
Fig. 7.3
ICE CREAM LINE
Disconnect the machine from the filling line (Part.1,
Fig.7.3);
Take out the mixer (Part.2, Fig.7.3), disconnect
the fixing clamps (Part.3, Fig.7.3) and take off the
connecting pipe (Part.4, Fig.7.3).
Connect the washing pipe to the pump inlet, (Part.5,
7.2.4 Before extended period of disuse
•
Wash and dry the various components, lubricate
them (especially the gaskets) with vaseline and
reassemble them.
Fig.7.3) e proceed with the washing.
Materials required: water, detergent, disinfectant.
Lubricate the gaskets; after drying the various
components, lubricate them with neutral vaseline
before reassembling.
Material required: vaseline
Materials required: water - detergent -
disinfectant - vaseline.
RETURN TO PM