preparatIon
11
© TESVOLT We reserve the right to make technical changes! RD.TI.026.E.ENG_Installation_Manual_TSHV70OD_v.B.01 Last revised 01/2021
Figure 3.1 Permissible and impermissible storage positions of a packaged battery module
3.5 INSTALLATION SITE
Necessary prerequisites
Section “1.5 Appropriate use” on page 6 lists all the necessary prerequisites and conditions for
installing a TS HV 70 Outdoor.
When selecting the installation site, bear in mind the transport routes and the necessary site
clearance.
ATTENTION! Possible damage to the building due to excessive loads
When fully installed, the battery storage system weighs up to 1,101 kg. Ensure that the installation loca-
tion has sufficient load-bearing capacity. If in doubt, consult a structural engineer.
Dimensions and distances
Both diagrams: view from above
Foundation
Space requirements
All measurements in cm.
10
10
173.5
21
5
11.5
31
93.5
73.5
170
20
270
60
Assembly allowance
Required space
(incl. installation)
Fastening points base
4 x M12 threaded inserts or M12 threaded rods
(protruding length: min. 30 mm; max. 70 mm)
Position/size of the floor outlet
The exact foundation size and depth depends on the‚
cabinet and site conditions.
(For example: floor conditions, cabinet mass, etc.)
This should be determined by a structural engineer
on site.
Foundation
Space requirements
All measurements in cm.
10
10
21
5
31
170
20
270
60
Assembly allowance
Required space
(incl. installation)
Position/size of the floor outlet
Required cabinet footprint
153.5
STOP
STOP