CommIssIonIng
41
© TESVOLT We reserve the right to make technical changes! RD.TI.026.E.ENG_Installation_Manual_TSHV70OD_v.B.01 Last revised 01/2021
15
The 125 A NH00 fuses
9
or
37
(see “5.8 Connector panel” on
page 19 et. seq.) for the battery inverter can now be inserted in
the left fuse holder. To do this, open the left fuse holder and push
the fuses into the relevant slot parallel to the holder. Then close
the fuse holder.
16
Once the NH00 fuses have been inserted, wait until the SMA STPS 60 has completely started up.
17
The TS HV 70 Outdoor switches to “INIT” mode and the switch
starts to flash.
18
Start the commissioning process of the SMA STPS 60 with the
SMA LCS Tool. The software and a manual can both be found on
the TESVOLT USB-Stick
11
.
Once the commissioning process has
been successfully completed, all the TS HV 70 Outdoor units
switch to precharge mode “PRECH”.
19
Once the precharging has completed successfully, the switches in
all the APU HV1000-Ss in the master/slave arrangement are per-
manently illuminated. “OK” appears as the Status item on the dis-
play. All the TS HV 70 Outdoor units are now ready for operation.
NOTE:
The display remains active for approximately two minutes and is then deactivated. It can be reacti-
vated by tapping twice.
20
Close the connector panel on the SMA STPS 60. Then refit the
cover
I
and lock using the key
T
.
Содержание TS HV70 Outdoor
Страница 1: ...LITHIUM STORAGE SYSTEM TS HV70OUTDOOR Installation and Operating Manual ...
Страница 60: ......