46
expandIng the storage system
© TESVOLT We reserve the right to make technical changes! RD.TI.026.E.ENG_Installation_Manual_TSHV70OD_v.A.01 Last revised
07/2020
10.2 EXPANDING CAPACITY USING ADDITIONAL TS HV 70 OUTDOOR UNITS
ATTENTION! Possible damage to the unit and/or battery inverter.
If you would like to use multiple TS HV 70 Outdoor battery storage systems on one SMA STPS 60, it is
essential that they all have the same capacity.
Note:
Up to four TS HV 70 Outdoor can be connected in parallel per SMA STPS 60 using the master/
slave principle.
Note:
When expanding by one more slave system, a BatBreaker must be ordered and installed.
System with 1 master and 1 slave
Master
BatBreaker
TERM:
ON
ADDRESS:
0/0
CAN OUT
>
CAN IN Slave 1
LAN
>
SWITCH LAN 2
TERM
ON
OFF
CAN IN
CAN OUT
CAN SMA
LAN
ADDRESS
APU Konfiguration Master
BATTERY
CHARGER
Slave 1
TERM:
ON
ADDRESS:
2/0
CAN IN
>
CAN OUT Master
LAN
>
optional LAN 1
TERM
ON
OFF
CAN IN
CAN OUT CAN SMA
LAN
ADDRESS
APU Konfiguration Slave 1
BATTERY
CHARGER
SMA STPS 60
THE ENERGY STORAGE EXPERTS
TSHV 70
Outdoor
THE ENERGY STORAGE EXPERTS
TSHV 70
Outdoor
STOP