background image

16770-C

Call Us First!

DO NOT RETURN TO STORE.

For questions on assembly or for general inquiries, you may contact us in the following ways:

Call customer service:

 1-877-743-3400

Did you enjoy building your shed? 

JOIN OUR TEAM

AND MAKE UP TO $1,500/WEEK*

o

r

 

v

is

i

t b

a

cky

ard

in

st

a

l

l

er

.

c

o

m

Flexible schedule 

No selling,

just building

Bonus incentives 

available

S

c

a

n

 t

h

f

 ow

c

o

de 

t

a

p

ply

 

to

d

a

y

.

INSTALLERS

WANTED

*based on number of completed installations

Call a Recruiter Today!  734-365-7000

visit us online at

help.backyardproducts.com

AVOID THE WAIT!

Submit a help request

Answers to frequently asked questions

Live chat with an agent

Содержание GABLE

Страница 1: ...EAM AND MAKE UP TO 1 500 WEEK o r v i sit backyardinstaller c o m Flexible schedule No selling just building Bonus incentives available S c a n t he f lowcode to apply t o d a y INSTALLERS WANTED based on number of completed installations Call a Recruiter Today 734 365 7000 visit us online at help backyardproducts com AVOID THE WAIT Submit a help request Answers to frequently asked questions Live ...

Страница 2: ...DC Puerto Rico 18 or older to participate Taxes on prize are responsibility of winner Odds of winning depend on the number of eligible reviews received Void where prohibited For complete details and official rules visit https backyardreviews net sweepstakes rules Scan QR code above Click write a review Find your product Tell us what you think Submit your review You ll be notified by e mail if you ...

Страница 3: ...c restrictions and or requirements before building ENGINEERED DRAWINGS Contact our Customer Service Team if engineered drawings are needed to pull local permits SURFACE PREPARATION To ensure proper assembly you must build your shed on a level surface Recommended methods and materials to level your shed are listed on page 9 CHECK ALL PARTS Inventory all parts listed on pages 3 5 Contact our Custome...

Страница 4: ... the assembly or installation Level Gloves Framing lumber is graded for structural strength and not appearance Exterior trim is graded for 1 good side Always install the material leaving the best edge and best surface visible Please remember that these blemishes in no way negatively affect the strength or integrity of our product See Fig A B C A Safety Glasses Tape Measure Paint Tools Ladder Caulk...

Страница 5: ...x4 2 x 3 x 69 5 x 7 6 x 175 3 cm OV x4 2 x 3 x 77 5 x 7 6 x 196 cm PB x2 2 x 3 x 92 5 8 5 x 7 6 x 235 3 cm PM x2 2 x 3 x 94 1 2 5 x 7 6 x 240 cm PR 2 x 4 x 65 7 8 5 x 10 x 167 cm x6 x4 x4 CV 5 8 x 4 x 14 1 6 x 10 x 35 6 cm x8 WNA 2 x 3 x 58 5 x 7 6 x 147 3 cm x4 CDD 1 x 3 x 94 3 4 2 5 x 7 6 x 240 1 cm x2 x2 x2 HS 1 x 3 x 94 3 4 2 5 x 7 6 x 240 1 cm x2 x2 FO 2 x 3 x 46 1 4 5 x 7 6 x 117 5 cm x2 NH ...

Страница 6: ... x 12 7 x 236 9 cm x2 x2 x4 3 8 x 48 x 72 1 x 122 x 183 cm x1 x1 x1 x1 x1 RIGHT DOOR x1 LEFT DOOR x1 RIGHT x1 LEFT x4 3 8 x 5 x 48 0 9 x 12 7 x 122 cm 10x8 10x12 10x16 x2 x2 x2 4 DOOR HARDWARE Not Actual Size 3 4 19 mm 3 4 19 mm 3 4 19 mm 64 Metal Threshold Bagged seperately special coating x1 x4 x1 x1 x7 x11 Roof panels are 7 16 11 mm thick x4 x2 19 x 48 48 x 122 cm 48 x 96 122 x 244 cm ...

Страница 7: ... Roof panels are 7 16 11 mm thick x4 x6 x8 x2 x2 x2 x2 x4 19 x 48 48 x 122 cm 19 x 48 48 x 122 cm 19 x 48 48 x 122 cm 48 x 96 122 x 244 cm 48 x 96 122 x 244 cm 48 x 96 122 x 244 cm 48 x 48 122 x 122 cm 48 x 48 122 x 122 cm 2 5 0 cm x1 1 lb of 2 5 0 cm 2 5 0 cm 2 5 0 cm x2 x2 1 lb of 2 5 0 cm 1 lb of 2 5 0 cm ...

Страница 8: ...Use acrylic latex exterior caulk that is paintable FOUNDATION OR FLOOR MATERIALS Your shed kit does not include a wood floor frame or floor panel materials See page 8 for the additional oor panel sizes and quantities required This shed does not include any leveling materials See the FLOOR LEVELING section on page 10 for recommended methods and suggested materials to properly level your oor as this...

Страница 9: ...al code for concrete foundation requirements 120 305 cm 120 305 cm 120 305 cm 85 5 8 217 cm 133 5 8 339 cm 181 5 8 461 cm 10 x 7 8 5 8 305 x 235 cm 10 x 11 8 5 8 305 x 357 cm 10 x 15 8 5 8 305 x 479 cm 10 x 8 305 x 244 cm 10 x 12 305 x 366 cm 10 x 16 305 x 488 cm 92 5 8 235 cm 151 1 2 385 cm 140 5 8 357 cm 185 470 cm 188 5 8 479 cm 224 568 cm Treated Sill Plate Caulk between sill plate and concret...

Страница 10: ...x 12 10 x 16 10 x 16 8 2 5 0 cm x1 x1 1 lb of 2 5 0 cm Hot Dipped Galvanized Box Type Nails 1 lb of 3 7 8 cm Hot Dipped Galvanized Deck Type Nails FLOOR PANELS Not Included You may need floor panels and nails to complete your floor Floor panel sizes and quantities are shown below Use a minimum of 5 8 1 6 cm Oriented Strand Board OSB 5 8 x 23 7 8 x 92 5 8 1 6 x 60 6 x 235 3 cm 5 8 x 23 7 8 x48 1 6 ...

Страница 11: ... 10 x 10 x 305 cm Treated Lumber x4 10 x 12 4 x 4 x 10 10 x 10 x 305 cm Treated Lumber x5 10 x 16 4 x 4 x 10 10 x 10 x 305 cm Treated Lumber Fasteners for Frame to 4 x 4 3 Screws shown as 1 option Minimum 12 for each runner 3 screws exterior grade Use only wood treated for ground contact and fasteners approved for use with treated wood Always support frame seams Leveling higher than 16 not recomme...

Страница 12: ...m Treated Wood 2 x 4 x 89 1 2 5 x 10 x 227 cm Treated Wood 2 x 4 x 48 5 x 10 x 122 cm Treated Wood Center on marks Center on marks 120 305 cm 48 122 cm 48 122 cm 24 61 cm 72 183 cm 96 244 cm Offset Seam Offset Seam Flush at ends BEGIN 1 D O O R You have finished your 10 x 8 floor frame If building 10 x 8 kit go to page 13 If building 10 x 12 kit go to page 11 If building 10 x 16 kit go to page 12 ...

Страница 13: ... x 8 floor section 1 PARTS REQUIRED Flush at ends Center on marks 45 114 3 cm 48 122 cm 48 122 cm 1 1 2 3 8 cm 120 305 cm 48 122 cm 48 122 cm 24 61 cm 72 183 cm 96 244 cm 72 183 cm x2 x28 x2 x6 10 x 12 FLOOR FRAME Not Included BEGIN You will build 2 floor sections Offset Seam 2 x 4 x 45 5 x 10 x 114 3 cm 2 x 4 x 48 5 x 10 x 122 cm 2 x 4 x 72 5 x 10 x 183 cm Offset Seam Seam HINT For easier nailing...

Страница 14: ... x 8 floor section 1 PARTS REQUIRED x2 x28 x2 x6 10 x 16 FLOOR FRAME Not Included BEGIN You will build 2 floor sections 2 x 4 x 93 5 x 10 x 236 2 cm 2 x 4 x 48 5 x 10 x 122 cm 2 x 4 x 72 5 x 10 x 183 cm Offset Seam HINT For easier nailing stand on frame Section 2 Section 1 Flush at ends Center on marks 93 236 2 cm 96 244 cm 48 122 cm 1 1 2 3 8 cm 120 305 cm 48 122 cm 48 122 cm 24 61 cm 72 183 cm 9...

Страница 15: ... The diagonal measurement will be approximately 151 1 2 385 cm When the frame is level and square secure 1 side of frame to the 4x4 runners using 1 fastener at ends of each runner At the opposite end of the frame secure the frame to 4x4 runners with 1 fastener at ends of each runner making sure the frame remains square Fig A Once the floor frame is level and square fasten the frame at each point t...

Страница 16: ...asurements are the same the frame is square The diagonal measurement will be approximately 185 470 cm When the frame is level and square secure 1 side of frame to the 4x4 runners using 1 fastener at ends of each runner At the opposite end of the frame secure the frame to 4x4 runners with 1 fastener at ends of each runner making sure the frame remains square Fig A Once the floor frame is level and ...

Страница 17: ...diagonal measurement will be approximately 224 568 cm When the frame is level and square secure 1 side of frame to the 4x4 runners using 1 fastener at ends of each runner At the opposite end of the frame secure the frame to 4x4 runners with 1 fastener at ends of each runner making sure the frame remains square Fig A Once the floor frame is level and square fasten the frame at each point the frame ...

Страница 18: ...ecure panel with 2 nails in the corners 2 BEGIN 1 3 4 Continue securing the panel using 2 nails spaced 6 apart on edges and 12 apart inside panel Use a chalk line or use pre painted grid lines to nail into joists under panel Ensure your floor frame is square by installing 1 panel and squaring frame Check the floor frame is square by measuring diagonally across the frame corners If the measurements...

Страница 19: ... your floor panels and can continue at p 22 If building the 10 x 12 kit continue at page 18 If building the 10 x 16 kit continue at p 20 PARTS REQUIRED x95 10 x 8 FLOOR PANELS Not Included 6 FINISH 2 5 cm 92 5 8 235 cm 120 305 cm 23 7 8 61 cm 48 122 cm Flush 12 30 5 cm 6 15 cm Flush 48 x 92 5 8 122 x 235 3 cm x1 x1 Grid lines UP 5 8 x 23 7 8 x 92 5 8 1 6 x 61 x 235 cm FLOOR PANELS NOT INCLUDED SEE...

Страница 20: ...ction 1 Secure using 2 nails spaced 6 apart on edges and 12 apart inside panel Use a chalk line or use pre painted grid lines to nail into joists under panel 2 BEGIN 1 x1 6 15 cm edges of panel 120 305 cm 48 122 cm 12 30 5 cm inside panel Grid lines UP 48 122 cm Flush 92 5 8 235 cm 3 4 19 mm Approximately 48 x 48 122 x 122 cm Section 2 Section 1 FLOOR PANELS NOT INCLUDED SEE PAGE 8 FOR PANEL SIZES...

Страница 21: ...ines as shown 3 You have finished Installing your floor panels Continue on page 22 PARTS REQUIRED x95 4 FINISH 2 5 cm D O O R 6 15 cm edges of panel 120 305 cm 48 122 cm 12 30 5 cm inside panel Grid lines UP 48 122 cm 23 7 8 61 cm Flush 92 5 8 235 cm 48 x 48 122 x 122 cm x1 x1 5 8 x 23 7 8 x 48 1 6 x 61 x 122 cm Section 2 Section 1 FLOOR PANELS NOT INCLUDED SEE PAGE 8 FOR PANEL SIZES AND QUANTITIE...

Страница 22: ...cure the panel with 2 nails spaced 6 apart on edges and 12 apart inside panel Use a chalk line or use pre painted grid lines to nail into joists under panel 2 BEGIN 1 48 x 96 122 x 244 cm x1 6 15 cm edges of panel 120 305 cm 96 244 cm 12 30 5 cm inside panel Grid lines UP 48 122 cm Flush 92 5 8 235 cm 3 4 19 mm Approximately Section 2 Section 1 FLOOR PANELS NOT INCLUDED SEE PAGE 8 FOR PANEL SIZES ...

Страница 23: ...h side up painted grid lines 3 Your floor panels are now installed Continue on page 22 PARTS REQUIRED x95 4 FINISH 2 5 cm 5 8 x 48 x 96 1 6 x 122 x 244 cm x1 x1 5 8 x 23 7 8 x 96 1 6 x 61 x 244 cm 6 15 cm edges of panel 120 305 cm 96 244 cm 12 30 5 cm inside panel Grid lines UP 48 122 cm 23 7 8 61 cm Flush 92 5 8 235 cm Section 2 Section 1 FLOOR PANELS NOT INCLUDED SEE PAGE 8 FOR PANEL SIZES AND Q...

Страница 24: ...ling floor panels Re level if needed The floor should used as a stable work surface for wall construction Organize your assembly procedure during the build process to avoid over handling of the walls HINT IMPORTANT DOOR SIDE WALL SIDE WALL FRONT WALL BACK WALL DOOR ...

Страница 25: ...s to fit measurements Fig B Screw blocks in place to measurement shown Make sure blocks are square and at 125 317 5 cm You have finished building a Rafter Jig 2 3 BEGIN 1 1 1 4 3 2 cm Chalk Line Square Fig B Fig A 125 317 5 cm Flush GBB GBB OO NH NH GBB GBB Flush D O O R 18 1 2 2 1 1 4 3 2 cm Screws per block 1 x 3 x 7 1 2 2 5 x 7 6 x 19 cm x4 GBB 125 317 5 cm Rafter jig on wood floor Rafter jig o...

Страница 26: ...r rafter assembly and secure gusset to back side of rafter Unscrew jig and save blocks Set aside rafters and proceed to building your back wall Contact at peak 4 2 BEGIN 1 PARTS REQUIRED 2 x 4 x 65 7 8 5 x 10 x 167 cm 6 x 24 15 x 61 cm x6 x10 x14 x6 x10 x14 x72 CV Place 2 rafter halves CV on floor jig You will assemble 4 rafters D O O R NH as temporary supports OO as temporary support Rafter jig o...

Страница 27: ... 2 3 8 cm 1 1 2 3 8 cm 1 1 2 3 8 cm 94 1 2 240 cm Orient parts on edge on floor as shown Secure with 2 3 nails at each connection 2 1 BEGIN 3 7 6 cm PB PB NH PR PARTS REQUIRED BACK WALL FRAME 3 7 6 cm Nails D O O R HINT 2 x 3 x 46 1 4 5 x 7 6 x 117 5 cm 2 x 3 x 77 5 x 7 6 x 196 cm 2 x 3 x 94 1 2 5 x 7 6 x 240 cm x1 x6 x2 x1 PB NH PR ...

Страница 28: ... Secure with 2 3 screws at middle connection 3 FINISH Your back wall frame is now assembled PARTS REQUIRED 3 7 6 cm BACK WALL FRAME 2 x 3 x 46 1 4 5 x 7 6 x 117 5 cm x1 x2 NH 46 1 4 117 5 cm 1 1 2 3 8 cm 48 3 4 124 cm 48 3 4 124 cm NH 2 3 7 6 cm Screws ...

Страница 29: ...side facing up BEGIN Use a 3 4 gauge block at edges of panel 1 Secure with 2 nails spaced 6 apart on edges and 12 apart inside panel Do not nail in groove BACK WALL PANELS 2 5 cm PARTS REQUIRED 3 4 GAUGE BLOCK D O O R x32 Maintain 1 measurement as shown Fig A Fig B Primed side UP For squareness maintain 3 4 measurement along panel edges x1 3 8 x 48 x 84 1 x 122 x 213 4 cm ...

Страница 30: ...back frame as shown with primed side facing up 2 Use a 3 4 gauge block at edges of panel Secure with 2 nails spaced 6 apart on edges and 12 apart inside panel Do not nail in groove BACK WALL PANELS 2 5 cm PARTS REQUIRED x32 3 4 GAUGE BLOCK D O O R Your back wall panels are secured to the framing FINISH To draw panels tight at seams angle nail Gauge Block x1 3 8 x 48 x 84 1 x 122 x 213 4 cm ...

Страница 31: ...e panel flush to edges with 8 1 1 4 screws spaced 10 apart You have finished building 2 sets of wing wall assemblies Set 1 LEFT and 1 RIGHT wing walls aside Continue building your back wall BEGIN D O O R Flush 2 1 2 6 35 cm 2 1 2 6 35 cm x2 x2 Use 2x3 s for support 10 25 4 cm Approximately OY Primed Side Down Fig A Locate OY flush to these edges WING WALL PANELS PARTS REQUIRED x32 2 x 3 x 72 5 x 7...

Страница 32: ... 6 apart Place wing wall assemblies on frame with bottom of panels flush 5 Your wing walls are now installed FINISH Do not nail in groove D O O R LEFT RIGHT HINT To draw panels tight at seams angle nail BACK WALL PANELS 2 5 cm x1 x24 x1 PARTS REQUIRED LEFT RIGHT Pre assembled Pre assembled Primed side UP Primed side UP ...

Страница 33: ...els with 2 nails along edge as shown Place left gable panel onto frame primed side up and flush to left panel NOTE Panel grooves will not align Place right gable panel onto frame primed side up and flush to left panel NOTE Panel grooves will not align You have finished building your back wall FINISH 5 1 BEGIN Primed side UP Primed side UP Flush Flush Gauge Block Use a 2x3 for support Use a 2x3 for...

Страница 34: ... 2 PB to PR with 2 3 nails at each end Arrange 2 PB 1 PR and 1 LT on edge on floor Ensure LT is centered with PR and nail in place with 2 3 nails 2 You have finished building your front wall frame FINISH BEGIN 1 FRONT WALL FRAME 3 7 6 cm PARTS REQUIRED x2 2 x 3 x 22 1 8 5 x 7 6 x 56 cm 2 x 3 x 94 1 2 5 x 7 6 x 240 cm x1 x1 x6 LT 2 x 3 x 77 5 x 7 6 x 196 cm PB PR D O O R HINT ...

Страница 35: ... 1 9 cm 97 1 2 247 7 cm 33 2 5 cm 3 4 GAUGE BLOCK FRONT WALL PANELS 1 BEGIN Place LEFT panel on front frame as shown with primed side up Use a 3 4 gauge block on edges of panel Secure panel to frame with 2 nails spaced 6 apart Do not nail in groove PARTS REQUIRED x1 x22 D O O R Primed Side UP 3 4 GAUGE BLOCK 3 4 GAUGE BLOCK ...

Страница 36: ...surements 34 2 5 cm 3 4 GAUGE BLOCK FRONT WALL PANELS 2 Place RIGHT panel on front frame primed side up Use a 3 4 gauge block on edges of panel Secure panel to frame with 2 nails spaced 6 apart Do not nail in groove To draw panels tight at seams angle nail D O O R PARTS REQUIRED x22 x1 Gauge Block Primed Side UP ...

Страница 37: ...ssembled Primed Side UP 3 Your front wall is now assembled FINISH Place wing wall panels onto frame with bottom of panels flush Secure wing wall assemblies with 2 nails spaced 6 apart Do not nail in groove To draw panels tight at seams angle nail D O O R 6 15 2 cm 6 15 2 cm Use a 2x3 for support ...

Страница 38: ...ge on floor Measure and mark from end of boards If building 10 x 12 kit go to page 38 If building 10 x 16 kit go to page 42 IMPORTANT You will build 2 identical walls Secure with 2 3 nails at each mark 3 7 6 cm PARTS REQUIRED x6 2 x 3 x 69 5 x 7 6 x 175 cm x4 7 16 x 2 1 2 x 24 3 4 1 1 x 6 4 x 62 9 cm OV x2 2 x 3 x 92 5 8 5 x 7 6 x 235 3 cm PM x14 D O O R Center on marks HINT 3 7 6 cm Nails ...

Страница 39: ...x 3 Fig A Keep panel flush along entire edge of 2 x 3 top plate Fig A Install soffit panel flush to 2 x 3 Fig A and with a 3 8 offset at ends Fig B C Secure with 11 1 1 4 screws D O O R 1 1 4 3 2 cm 37 Fig A Fig C Fig B PRIMED SIDE Flush 3 8 10 mm 3 8 10 mm 93 1 4 236 9 cm 9 1 2 24 cm 10 x 8 SIDE WALL FRAME SOFFIT ...

Страница 40: ...the gauge block to mark the 3 4 measurement on the wall stud Locate the panel flush under the soffit panel Secure panel with 2 2 nails in the corners Fig A 7 6 Secure the panel with 2 nails spaced 6 apart on edges and 12 apart inside panel Ensure your wall frame is square by installing 1 panel and squaring frame Move to the opposite end Using the long edge of the panel as a lever move the panel si...

Страница 41: ... AND LIP EDGES Secure panel with 2 nails spaced 6 apart on edges and 12 apart inside panel 8 Carefully flip your side wall over Repeat steps to assemble your second side wall Do not nail in groove You have finished building both of your side walls Go to page 46 FINISH Flush 6 15 cm 48 122 cm 12 30 cm LIP EDGE SQUARE EDGE To draw panels tight at seams angle nail D O O R ...

Страница 42: ... FRAMES 1 BEGIN 2 If building 10 x 12 kit arrange parts on edge on floor Measure and mark from end of boards If building 10 x 16 kit go to page 42 IMPORTANT You will build 2 walls the same Secure wih 2 3 nails at each mark 3 7 6 cm PARTS REQUIRED x6 x2 2 x 3 x 69 5 x 7 6 x 175 cm 2 x 3 x 48 5 x 7 6 x 122 cm x4 x2 7 16 x 2 1 2 x 24 3 4 1 1 x 6 4 x 62 9 cm 7 16 x 2 1 2 x 48 1 1 x 6 4 x 122 cm OV NK ...

Страница 43: ...against 2 x 3 as shown Fig A Keep panel flush along entire edge of 2 x 3 top plate Fig A Install soffit panels flush to 2 x 3 Fig A and with 3 8 offset at ends Fig B C Secure with 14 1 1 4 screws 1 1 4 3 2 cm D O O R 41 Fig A Fig C Fig B PRIMED SIDE Flush 3 8 10 mm 3 8 10 mm 93 1 4 236 9 cm 48 122 cm 9 1 2 24 cm 10 x 12 SIDE WALL FRAME SOFFIT ...

Страница 44: ... the gauge block to mark the 3 4 measurement on the wall stud Locate the panel flush under the soffit panel Secure panel with 2 2 nails in the corners Fig A 8 7 6 Secure the panel with 2 nails spaced 6 apart on edges and 12 apart inside panel Ensure your wall frame is square by installing 1 panel and squaring frame Move to the opposite end Using the long edge of the panel as a lever move the panel...

Страница 45: ...ARE AND LIP EDGES Secure with 2 nails spaced 6 apart on edges and 12 apart inside panel 9 Carefully flip your side wall over Repeat steps to assemble your second side wall Do not nail in groove You have finished building both of your side walls Go to page 46 FINISH Flush 6 15 cm 48 122 cm 12 30 cm LIP EDGE SQUARE EDGE To draw panels tight at seams angle nail D O O R ...

Страница 46: ...0 5 cm 94 1 4 239 4 cm 70 1 4 178 4 cm 46 1 4 117 5 cm 48 122 cm D O O R 44 10 x 16 SIDE WALL FRAMES 1 BEGIN Measure and mark from end of boards IMPORTANT You will build 2 walls the same Secure with 2 3 nails at each mark 3 7 6 cm PARTS REQUIRED x6 x2 2 x 3 x 69 5 x 7 6 x 175 cm 2 x 3 x 48 5 x 7 6 x 122 cm x4 x4 7 16 x 2 1 2 x 24 3 4 1 1 x 6 4 x 62 9 cm 7 16 x 2 1 2 x 48 1 1 x 6 4 x 122 cm OV NK x...

Страница 47: ...st 2 x 3 as shown Fig A Keep panel flush along entire edge of 2 x 3 top plate Fig A Install soffit panels flush to 2 x 3 Fig A and with 3 8 offset at ends Fig B C Secure with 19 1 1 4 screws 1 1 4 3 2 cm D O O R 45 10 x 16 SIDE WALL FRAME SOFFIT Fig A Fig C Fig B Flush 3 8 10 mm 3 8 10 mm 93 1 4 236 9 cm 48 122 cm 48 122 cm 9 1 2 24 cm PRIMED SIDE ...

Страница 48: ... 4 Ensure your wall frame is square by installing 1 panel and squaring frame Move to the opposite end Using the long edge of the panel as a lever move the panel side to side until you have a 3 4 measurement on the wall stud Secure corner with 2 2 nails 3 4 Gauge Block Fig A Fig B 3 4 19 mm 3 4 19 mm 2 Nails 2 Nails Secure the panel with 2 nails spaced 6 apart on edges and 12 apart inside panel Pla...

Страница 49: ...RE AND LIP EDGES Secure panels with 2 nails spaced 6 apart on edges and 12 apart inside panel 6 Do not nail in groove Carefully flip your side wall over Repeat steps to assemble your second side wall You have finished building both of your side walls Go to page 46 FINISH Flush 6 15 cm 48 122 cm 48 122 cm 48 122 cm 12 30 cm LIP EDGE SQUARE EDGE To draw panels tight at seams angle nail ...

Страница 50: ...all assembly on the 120 305 cm floor dimension 2 BEGIN 1 Secure lower edge of panel to floor frame with 2 nails spaced 6 apart Angle nail to hit floor frame Fig A 3 Secure back wall uprights to floor with 2 3 screws Fig B 4 Your back wall is now standing FINISH 120 305 cm 3 7 6 cm Screws Nail 2 nails first Angle to nail into floor frame 2 5 cm Nail Fig A 3 7 6 cm Screw 3 7 6 cm Screw 3 7 6 cm Scre...

Страница 51: ... panel edge and the trim is the same along the entire length Secure with 1 2 nail in the upper corner Fig C Secure the panel edge to the trim with 2 nails spaced 6 apart Secure bottom of panel with 2 nails spaced 6 apart Angle nail to hit floor frame Fig D Stand right side wall on floor It is important to secure the side wall in the following order Additional fasteners needed for 10 x 12 kit or 10...

Страница 52: ...nter front wall on floor side to side The side wall soffit will overlap the front wall 3 8 Fig A Nail the front wall flush to the floor using 2 nails spaced 6 apart Angle nails to hit floor frame Fig B Nail the lower side wall corner to the front wall trim with 1 2 nail Fig C 1 BEGIN 6 15 cm 2 5 cm Nail 6 15 cm Same Measurement Side Panel Fig D Trim 2 5 cm Nail 50 2 5 cm 3 7 6 cm FRONT WALL INSTAL...

Страница 53: ... edge of groove Fig A Install trim with 8 1 1 4 screws from inside Install 2 screws at seam Fig B Install 2nd CDD flush to panel edge and flush to installed CDD Fig A Secure trim with 8 1 1 4 screws from inside Install 2 screws at seam Fig B Repeat steps to attach the back trim You have attached your upper trim Continue to attaching your endcaps 2 BEGIN 1 Fig A Fig B 8 20 3 cm Approximately ...

Страница 54: ...inside fasten XMA with 3 4 screws in the pattern shown Your back wall gable trim is now installed 2 BEGIN 1 BACK WALL GABLE TRIM PARTS REQUIRED x1 XMA 11 16 x 2 1 2 x 60 5 8 1 7 x 6 3 x 154 cm 3 4 1 9 cm x11 D O O R Flush Flush GABLE TRIM LEVEL XMA XMA INSIDE 11 3 4 1 9 cm Screws 1 1 4 3 2 cm 2 1 2 6 3 cm SEAM ...

Страница 55: ... steps to build 2 more endcaps BEGIN 1 PARTS REQUIRED 1 1 4 3 2 cm x14 GBB GBB D O O R x4 1 x 3 x 7 1 2 2 5 x 7 6 x 19 cm GBB x4 3 4 x 5 1 8 x 8 3 8 1 9 x 13 x 21 3 cm LEFT PAINTED GREEN RIGHT PAINTED RED 4 1 1 4 3 2 cm Screws Flush Flush Fig A Locate endcaps flush with upper trim and corner trim Secure each endcap from inside of shed with 4 1 1 4 screws as shown Fig A 2 ...

Страница 56: ...t panel into rafters with 1 2 screw Fig A Repeat steps to install 3 additional rafters Secure with 2 3 screws at each end Fig B Re tighten 2 screws if neccessary Your rafters are now installed Flush 2 BEGIN 1 PARTS REQUIRED pre assembled x3 x12 x6 Screw into top plate Align over studs Maintain the measurements between rafters 2 5 cm 2 5 cm Screw Fig A 1 2 5 cm Fig B D O O R NOTE Measurements from ...

Страница 57: ...ching 1 panel fist You will use the panels long edge as a lever to bring your roof into square Commonly known as racking Roof panels may cause serious injury until securely fastened Install 1 48 x 96 panel with the rough side up painted grid lines side with a 1 8 measurement on the rafter Fig A and the panel flush at the peak Fig B Secure panel with 2 nails in the corners 1 BEGIN 2 Nails 48 122 cm...

Страница 58: ... apart inside panel Fig F 3 Install the lower roof panels flush to the upper panels and with a 1 8 measurement at the gable trim Fig G Nail the roof panel using 2 nails spaced 6 apart on edges and 12 apart inside panel Repeat process to attach roof panels on the opposite side 4 12 30 5 cm 6 15 cm Fig F PARTS REQUIRED 2 5 cm x104 22 1 4 56 5 cm 22 1 4 56 5 cm 24 61 cm 24 61 cm Fig E NOTE Measuremen...

Страница 59: ...Install fascia trim flush under roof panel Fig A and endcaps at ends of rafters Fig B Secure with 2 nails as shown Repeat steps to install fascia trim on both sides Your fascia trim boards are now installed 1 x 3 x 94 3 4 2 5 x 7 6 x 240 6 cm x2 HS Fig B D O O R Fig A ...

Страница 60: ...ely Fasten temporary support ZJ at bottom with 1 1 4 screws in middle and 2 screws at ends Tighten securely D O O R HINT Look for 3 8 SPACER attached to doors ZJ OO Make sure spacer is attached Tighten screws securely OFFSET 4 3 7 6 cm Screws Screws in middle 1 1 4 3 cm Screw at ends 2 5 cm Bottom edges flush 3 8 1 cm 3 8 1 cm 3 8 1 cm 3 8 1 cm OFFSET GREEN RED 3 7 6 cm OO x1 x2 x2 x4 ZJ x1 5 8 x ...

Страница 61: ...H You have finished installing your doors Screw hinge boards into wall supports and floor using 4 3 screws as shown Ensure screws penetrate into framing and floor Fig C D 5 3 7 6 cm Screws into the wall support and floor frame Fig B Center 3 8 measurement on right edge of groove Fig C 3 8 1 cm Fig D Angle 3 7 6 cm Screw Install temporary support OO as a ledger board flush under wall panels with 2 ...

Страница 62: ...as shown Fig C 4 You have finished securing your door and trim FINISH BEGIN 1 Secure hinge boards from inside using 3 4 screws as shown Fig A 3 Center trim ZJ over doors and secure using 8 2 finish nails into framing as shown 2 Reinforce the door trim using 3 4 screws through door panel into trim Fig A Locate screws as shown in Fig B Secure with 2 screws at seams 11 Special coating screws Fig C PA...

Страница 63: ... x14 2 5 cm DOOR WEATHERSTRIP OO FINISH On right door center OO vertically in door opening Fig A OO will offset the right door 1 IN from the door trim Fig C 3 Secure OO with 7 3 screws through outside trim into OO Fig C 4 D O O R OO Screws 2 5 cm x14 1 2 5 cm OFFSET 1 2 5 cm OFFSET Secure OO with 7 3 screws through outside trim into OO Fig B 2 Fig A Fig B Center OO in door opening 11 28 cm Approxi...

Страница 64: ...door closed mark hole location for bolt to extend into HINT Extend bolt to leave a mark in wood Tap bolt with hammer Drill 3 8 hole deep enough for bolt to slide into 2 Install barrel bolt flush at top of OO on left door Secure with 3 4 screws as shown Fig A 1 x1 x4 x7 3 4 1 9 cm HINT With door closed extend bolt and tap with hammer to leave a mark in wood for drilling D O O R x1 3 4 1 9 cm Drill ...

Страница 65: ...r Panel as shown 2 1 Attach each using two 3 4 19 mm screws as shown You have finished attaching your door trim 63 BEGIN Your door trim is now installed FINISH Install WNA on lower section of door panel Secure from inside with 3 4 screws as shown 1 WNA 5 8 x 4 x 14 1 6 x 10 x 35 6 cm x8 WNA 3 4 1 9 cm x18 PARTS REQUIRED DOOR TRIM ...

Страница 66: ...low directions provided by manufacturer Snip bottom side of drip edge and bend over to other side of roof Follow directions provided by manufacturer PAINT CAULK NOT INCLUDED ROOF FELT NOT INCLUDED DRIP EDGE NOT INCLUDED Install over roof felt or over roof felt on gable side and under roof felt on eave side Fig A Do not use nails on side of drip edge that hangs over side of building Only nail top o...

Страница 67: ...cross with lower edge of roof deck NOTE If you have installed drip edge install shingles flush to drip edge BEGIN 1 TABS UP Shingle overlaps roof decking 1 2 5 cm overhang past roof deck 1 2 5 cm overhang or flush with drip edge 4 Nails BACK OF SHED FRONT OF SHED NEVER DRIVE FASTENERS INTO OR ABOVE SEALING STRIPS Familiarize yourself with a 3 Tab Shingle SHINGLE NAIL PATTERN 1 2 5 cm NAILS Sealing...

Страница 68: ... 5 cm Flush with starter row Flush with starter row Continue installing rows of shingles by staggering at front 4 SHINGLES continued Install second row of shingles flush at top of first row s rain slots Ensure 1 overhang or flush to drip edge at front stagger each row 3 1 2 5 cm 1 2 5 cm BACK OF SHED FRONT OF SHED FRONT OF SHED Flush with rain slots Flush with rain slots Notch Notch ...

Страница 69: ...at ridge cut to peak with a utility knife Repeat steps 1 7 to shingle the opposite side of your roof Trim shingles at ridge Once both sides are shingled you need to trim ends Strike a chalk line 1 from edge Using your shingle hooked blade carefully cut shingles along chalk line 5 7 6 9 8 SHINGLES continued If more than 5 to rain slot you must install another row of shingles 5 12 7 cm MAX Top of ra...

Страница 70: ...ut off pieces first Score shingle then snap off angled cut Install first ridge cap flush to shingles at front as shown Install second ridge cap 5 back as shown 2 3 BEGIN 1 2 5 cm 2 5 cm 2 5 cm 2 5 cm 2 5 cm 2 5 cm Top of slot Weather Seal Flush 1 Nail per side through weather seal 1 Nail per side through weather seal 5 12 7 cm FRONT OF SHED FRONT OF SHED Flush 20 to 22 Pieces ...

Страница 71: ... 4 between the shingle color and edge of shingles When you have 4 minimum of shingle color cut 1 piece to cap your roof Install flush to shingles 4 5 6 7 2 Nails per side You have finished your ridge cap FINISH 8 Flush to shingles Trim cap off flush to shingles Cap Cut at top of rain slot 4 10 cm ...

Страница 72: ...SB siding to include all exterior walls and all sides and all edges of doors Gazebos Pergolas To validate your warranty it is necessary to properly maintain your Backyard Storage Solutions LLC unit This includes treating all of the exposed cedar and pine surfaces on your gazebo or pergola structure with an exterior grade wood preservative an exterior oil based semi transparent stain an acrylic lat...

Отзывы: