125"
(317,5 cm)
1/4" (6 mm)
Gap
Gusset
24
RAFTERS
2" (5 cm)
FINISH
Secure gusset to rafter with 2" nails, staggered, as shown.
Repeat steps 1-4 to build (2) more assemblies for 10' x 8' Kit, (4) more assemblies
for 10' x 12' Kit, or six more assemblies for 10' x 16' Kit.
Flip over rafter assembly and secure gusset to back side of rafter.
Unscrew jig and save blocks. Set aside rafters and proceed to building your back wall.
Contact at
peak.
4
2
BEGIN
¸
1
PARTS REQUIRED:
2 x 4 x 65-7/8" (5 x 10 x 167 cm)
6 x 24" (15 x 61 cm)
x6/x10/x14
x6/x10/x14
x72
CV
Place (2) rafter halves
CV
on floor jig. You will assemble (4) rafters.
DOOR
NH as
temporary
supports
OO as
temporary
support
Rafter jig on wood foor
Rafter jig on concrete slab and sill plates