expandIng the storage system
49
© TESVOLT We reserve the right to make technical changes! RD.TI.026.E.ENG_Installation_Manual_TSHV70OD_v.A.01 Last revised
07/2020
Overview of all addressing options
BATTERY
CHARGER
ADDRESS
Set the address selector on the APU HV1000-S to match the configuration and data in the table below.
LEFT SELECTOR
RIGHT SELECTOR
DESIGNATION
0
0
Master 1
2
0
Slave 1 (of Master 1)
2
1
Slave 2 (of Master 1)
2
2
Slave 3 (of Master 1)
0
0
Master 2
2
0
Slave 1 (of Master 2)
2
1
Slave 2 (of Master 2)
2
2
Slave 3 (of Master 2)
0
0
Master 3
2
0
Slave 1 (of Master 3)
2
1
Slave 2 (of Master 3)
2
2
Slave 3 (of Master 3)
0
0
Master 4
2
0
Slave 1 (of Master 4)
2
1
Slave 2 (of Master 4)
2
2
Slave 3 (of Master 4)
10.3 EXPANDING THE POWER USING SMA STPS 60
Energy transfer
Communication
SMA
STPS 60
LAN 2
LAN 1
Switches
Switch
SMA
Inverter
Manager
THE ENERGY STORAGE EXPERTS
THE ENERGY STORAGE EXPERTS
THE ENERGY STORAGE EXPERTS
TSHV 70
Outdoor
THE ENERGY STORAGE EXPERTS
The charging and discharging power can be increased by increasing the number of SMA STPS 60
units. Up to 20 SMA STPS 60 units can be operated on one SMA Inverter Manager.