KRB-5404
90
5) Reinstall each part or component in reverse order of removal after inspection. As to the moving contact-related parts, however,
install the spacer, moving contact, upper separator, lower separator, spring washer and moving contact mounting screw in this
order, beginning wit the side of insulated operation rod. See Fig. 82.
6) After installing the moving and/or stationary contact, be sure to perform 10 - 20 cycles of open/close operation and then
retighten the contact mounting screws to the specified torque.