KRB-5404
85
(5) Flip the contact block down and slide the front cover to the original position as shown in Fig. 73.
Fig. 73 Sliding the front cover to the original position
(6) Perform manual closing/opening operation of the ACB. Refer to sections 4-1-2 and 4-1-3.
(7) Reinstall each part or component in reverse order of removal after inspection. When installing the UVT, make sure the
nameplate on the UVT can be viewed from the front of the ACB.
Fig. 74 provides the general view of the UVT.
Fig. 74 General view of UVT
Contact block
Front cover
Plunger
Terminal No.1
Terminal No.2
Terminal No.3
Hand connector (red, 3 Terminals)
Attraction coil resistance to be
measured between terminals 1 and 2.
Holding coil resistance to be measured
between terminals 1 and 3.
Plunger length measurement
UVT mounting screw