OPERATION EN
5
2100/2120/2140/2150/2200/2260 (12–02)
MACHINE COMPONENTS
1
4
9
10
5
2
3
12
6
7
8
4
11
13
15
14
1.
Control Handle
2.
Handle Height Adjustment lever
3.
Safety Lock Lever
4.
On/Off Lever
5.
Solution Control Lever for Optional Solution Tank
6.
Power Cord
7.
Power Cord Storing Hook
8.
Transport Wheels
9.
Motor
10. Component Housing
11. Circuit Breaker Reset Button (2200, 2260 Models)
12. Dual Speed Selector Switch (2260 Model)
13. Scrub Head Base
14. Bumper
15. Solution Supply Connector for Optional Solution
Tank
MACHINE ASSEMBLY
Carefully check carton for signs of damage. Report
damages at once to carrier.
ATTACHING HANDLE TO BASE
1.
Position the handle assembly on the base as
shown. Insert (4) screws, supplied, through the top
of the handle support and into the machine base.
From bottom side of base, secure screws with
nuts and washers, 13 mm wrench required
(Figure 1).
2.
Connect the power cord into the switch housing
receptacle (Figure 1).
FIG. 1
ATTACHING OPTIONAL SOLUTION TANK
1.
Attach the upper solution tank support bracket to
the handle as shown, do not tighten screws at this
time, 5mm allen wrench required (Figure 2).
FIG. 2