PN 76.8820IM30-A
Tellabs 8820 Multi-service Switch Router System Installation
2-2
Unpacking and Site Preparation
Safety Information
Safety Information
To ensure that you install the 8820 MSR safely, observe the following guidelines:
❑
Review the safety information in the Preface of this installation guide, and observe
safety admonishments provided in the notes, cautions, and warnings throughout this
manual.
❑
Comply with all applicable industrial safety requirements, practices, and standards.
❑
After installing the 8820 MSR, protect your equipment by using an ESD grounding
strap whenever handling system components. Follow proper grounding procedure by
first establishing an earth ground for the 8820 MSR, then attaching a wrist strap to the
ESD jack located on the 8820 MSR.
Unpacking the 8820 MSR
The 8820 MSR arrives in at least two crates, one of which contains the 8820 MSR chassis,
and other(s) that contain the Physical Line Modules (PLMs).
This section guides you through the unpacking process, in the following topics:
❑
Uncrate and Inspect, on page 2-3
❑
❑
Returning Products to Tellabs, on page 2-6
N
OTE
Begin inspecting for damage as soon as your shipment arrives. If you see
damage (such as punctures, damp spots, and crushed corners) at any
point when unpacking and inspecting, do not proceed with the unpacking
instructions in this chapter. Immediately notify the transfer company
about the damage, and record the damage on the bill of lading. Have the
transfer company’s agent acknowledge the damage by signing the bill of
lading under the damage notation.
N
OTE
Do not discard packing materials until you have completed the unpacking
procedures and verified the integrity of your 8820 MSR shipment. You
may need to reuse the packing materials if returning the product to
Tellabs.