08354B DCN7877
Teledyne API T640 PM Mass Monitor
12
EMC
IEC/EN 61326-1, Class A Emissions/Industrial Immunity
EN55011 (CISPR 11), Group 1, Class A Emissions
FCC 47 CFR Part 15B, Class A Emissions
CE: 2004/108/EC, Electromagnetic Compatibility Directive
2.
INSTALLATION AND HARDWARE SETUP
This section addresses the procedures for unpacking the instrument and inspecting
for damage, presents clearance specifications for proper ventilation, and shows the
instrument layout.
UNPACKING
Verify that there is no apparent external shipping damage. If damage has occurred,
please advise the shipper first, then contact Teledyne API.
Included with your instrument is a printed record of the final performance
characterization performed on your instrument at the factory. This record,
titledT640/640x Mass Monitor Test Data Sheet, is an important quality assurance
and calibration record and should be placed in the quality records file for this
instrument.
WARNING – ELECTRICAL SHOCK HAZARD
Never disconnect PCAs, wiring harnesses or electronic
subassemblies while under power.
With no power to the unit, carefully remove the top cover of the instrument and
check for internal shipping damage by carrying out the following steps:
1. Carefully remove the top cover and check for internal shipping damage.
a. Remove the cover screws located on the sides of the instrument.
b. Slide the cover backward until it clears the instrument’s front bezel.
c. Lift the cover straight up.
2. Inspect the interior to ensure all circuit boards and other components are
intact and securely seated.
3. Check the connectors of the various internal wiring harnesses and pneumatic
hoses to ensure they are firmly and securely seated.
4. Using the paperwork accompanying the instrument, verify that all of the
standard and optional hardware ordered with the unit has been installed.
These are listed on the paperwork accompanying the instrument.