Section 4— 2230 Service
PERFORMANCE CHECK PROCEDURE
INTRODUCTION
PURPOSE
The “ Performance Check Procedure” is used to verify
the instrument’s Performance Requirements statements
listed in Table 1-1 and to determine the need for calibra
tion. The performance checks may also be used as an
acceptance test or as a preliminary troubleshooting aid.
PERFORMANCE CHECK INTERVAL
To ensure instrument accuracy, check its performance
after every 2000 hours of operation or once each year, if
used infrequently. A more frequent interval may be neces
sary if the instrument is subjected to harsh environments
or severe usage.
STRUCTURE
The "Performance Check Procedure” is structured in
subsections to permit checking individual sections of the
instrument whenever a complete Performance Check is
not required. At the beginning of each subsection there is
an equipment-required list showing only the test equip
ment necessary for performing the steps in that subsec
tion. In this list, the Item number that follows each piece of
equipment corresponds to the Item number listed in
Table 4-1.
Also at the beginning of each subsection is a list of all
the front-panel control settings required to prepare the
instrument for performing Step 1 in that subsection. Each
succeeding step within a particular subsection should then
be performed, both in the sequence presented and in its
entirety, to ensure that control-setting changes will be
correct for ensuing steps.
TEST EQUIPMENT REQUIRED
The test equipment listed in Table 4-1 is a complete list
of the equipment required to accomplish both the "Per
formance Check Procedure" in th is . section and the
"Adjustment Procedure” in Section 5. Test equipment
specifications described in Table 4-1 are the minimum
necessary to provide accurate results. Therefore, equip
ment used must meet or exceed the listed specifications.
Detailed operating instructions for test equipment are not
given in this procedure. If more operating information is
required, refer to the appropriate test equipment instruc
tion manual.
When equipment other than that recommended is used,
control settings of the test setup may need to be altered.
If the exact item of equipment given as an example in
Table 4-1
is
not
available,
check
the
“ Minimum
Specification” column to determine if any other available
test equipment might suffice to perform the check or
adjustment.
LIMITS AND TOLERANCES
The tolerances given in this procedure are valid for an
instrument that is operating in and has been previously
calibrated in an ambient temperature between + 20°C and
+ 30eC. The instrument also must have had at least a 20-
minute warm-up period. Refer to Table 1-1 for tolerances
applicable to an instrument that is operating outside this
temperature range. All tolerances specified are for the
instrument only and do not include test-equipment error.
PREPARATION FOR CHECKS
It is not necessary to remove the instrument cover to
accomplish any subsection in the "Performance Check
Procedure," since all checks are made using operator-
accessible front- and rear-panel controls and connectors.
The most accurate display adjustments are made with
a stable, well-focused, low-intensity display. Unless other
wise
noted,
adjust
the
A
and
B
INTENSITY,
STORAGE/READOUT
INTENSITY,
FOCUS,
and
TRIGGER LE-VEL controls as needed to view the display.
4-1
Содержание 2230
Страница 12: ...2230 Service X The 2230 Digital Storage Oscilloscope 4998 01 ...
Страница 32: ...Operating Information 2230 Service 4998 04 Figure 2 4 Power and display controls and power on indicator 2 5 ...
Страница 33: ...Operating Information 2230 Service Figure 2 5 Vertical controls and connectors 2 6 ...
Страница 48: ...Operating Information 2230 Service Figure 2 11 X Y Plotter interfacing ...
Страница 56: ...Theory of Operation 2230 Service 4999 01 3 2 Figure 3 1 Simplified block diagram ...
Страница 68: ...Operating Information 2230 Service Figure 2 11 X Y Plotter interfacing ...
Страница 76: ...Theory of Operation 2230 Service 4999 01 3 2 Figure 3 1 Simplified block diagram ...
Страница 82: ...Theory of Operation 2230 Service 510 499 9 02 Figure 3 2 Block diagram of the Channel 1 Attenuator circuit 3 8 ...
Страница 98: ...Theory of Operation 2230 Service 499 9 06 Figure 3 6 Horizontal Amplifier block diagram 3 24 ...
Страница 111: ...Theory of Operation 2230 Service 3 37 Figure 3 9 Acquisition Memory timing ...
Страница 190: ...Maintenance 2230 Service 999 14 Figure 6 3 Isolated kernel timing 6 9 ...
Страница 218: ...Maintenance 2230 Service 4999 37 Figure 6 7 Location of screws and spacers on the Storage circuit board 6 37 ...
Страница 329: ...PUT Figure 9 2 S em ico n d u cto r lea d co n fig u ratio n s ...
Страница 332: ...2230Service CHASSIS MOUNTED PARTS ...
Страница 334: ...A14 CH 1 LOGIC BOARD ...
Страница 337: ......
Страница 344: ...u sr z z o 1 ...
Страница 347: ...i n 5 a O Q q o u S a o h UJ s a b c d e f g h j k l m n ...
Страница 352: ......
Страница 355: ...WAVEFORMS FOR DIAGRAM 5 4999 83 ...
Страница 358: ...I W L U O U rc a 4 2 s ...
Страница 361: ...WAVEFORMS FOR DIAGRAM 6 S 84 ...
Страница 362: ...2230 Service TEST SCOPE TRIGGERED ON U665 PIN 8 FOR WAVEFORMS 31 THROUGH 33 ...
Страница 365: ... I I ...
Страница 366: ...A 1 6 S W E E P R EFEREN CE BOARD FIG 9 17 2230 Service Figure 9 17 A16 Sweep Reference board ...
Страница 369: ... o 0 UJU sa eg aiu c u J in su eg 5 C sis n g e s o N QO ...
Страница 371: ...Static Sensitive Devices See Maintenance Section CM I rv CD o 2230 Service ...
Страница 378: ......
Страница 384: ... I I c o C u o a 5 r O tD v j If 3 IV if I I ci if 5 3 I ...
Страница 386: ......
Страница 388: ...H K L M N 7 8 8 2 2 3 0 INPUT OUTFUT WIRING INTERCONNECT ...
Страница 392: ...W A V E F O R M S F O R D IA G R A M 14 ...
Страница 393: ...2230Service 0 0 d s t 4 9 9 9 9 5 ...
Страница 394: ...2230 Service TEST SCOPE TRIGGERED ON U911 PIN 21 FOR WAVEFORMS 64 THROUGH 69 4999 92 ...
Страница 396: ... ...
Страница 397: ...WAVEFORMS FOR DIAGRAM 15 TEST SCOPE TRIGGERED ON U9111 PIN 21 FOR WAVEFORMS 70 THROUGH 77 ...
Страница 399: ......
Страница 403: ......
Страница 404: ......
Страница 405: ......
Страница 406: ...2230 Service n CD O O i 0 s a f s s o m O F ig u re 9 5 D e ta ile d S to ra g e b lo c k diagram 4999 22 ...
Страница 409: ......
Страница 415: ...IMF PU TPR A IR TM FQ U I W A V E F O R M SF O RO IA G R A M1 5 W A V E F O R M SF O R i ...
Страница 417: ...4999 9S ...
Страница 419: ...i s 5 0 C C p F 2 CC p 2 a u 4 I s c c O 2 e e o 5 a o 5 i 2 i f 2 E C 52 ...
Страница 421: ...TEST SCOPE TRIGGERED ON U4105 PIN 9 FOR WAVEFORMS 121 AND 122 TEST SCOPE TRIGGERED ON U4227 PIN 10 i 4999 97 ...
Страница 423: ...W A V E F O R M SF O RD IA G R A M1 8 O c n ...
Страница 424: ...Figure 9 22 A11A1 Input Output board ...
Страница 427: ...WAVEFORMS FOR DIAGRAM 19 TEST SCOPE TRIGGERED ON U6103 PIN 1 FOR WAVEFORMS 126 AND 127 4999 98 ...
Страница 430: ...Figure 9 23 A11A2 Vector Generator board ...
Страница 434: ...49 9 9 tOO ...
Страница 436: ......
Страница 437: ...22 3 0 S ervice W A V E F O R M S F O R D I A G R A M 2 1 m f n h ...
Страница 442: ...WAVEFORMS FOR DIAGRAM 22 4999 78 ...
Страница 443: ...XY PLOTTER BOARD DIAGRAM 22 See Parts List for serial number ranges ...
Страница 444: ... u i o IO U J J i o D U I 1 t ir u j t O 0 X I c a a 3 4 2230 4999 71 REV FE8 1987 XY PLOTTER BOARD 22 ...
Страница 447: ...A21 RS 232 OPTION BOARD Flfi A 9 K 01 01 W M ...
Страница 450: ......
Страница 452: ...COMPONENT NUMBER EXAMPLE ...
Страница 455: ...r n n i i i i n O T IA ll D A A o n XY PLOTTER BOARD P in A23 OPTION MEMORY BOARD FIG 9 27 A22 GPIB OPTION BOARD ...
Страница 459: ...A16 SWEEP REFERENCE ADJUSTMENT LOCATION ...
Страница 467: ...2230 Service ...
Страница 468: ......
Страница 474: ......
Страница 475: ...2230 Service ...
Страница 476: ...2230 Service ...
Страница 477: ... D ...
Страница 483: ...2230 Service ...