10 TEGAM WAY • GENEVA, OHIO 44041
440-466-
6100 • FAX 440
-466-
7-1
Section VII
–
Preparation for Shipment
Returning Power Meter for Service
Use the information in this section if you need to return your power meter to TEGAM.
Package Power Meter for Shipment
Use the following steps to package the power meter for shipment to TEGAM for service:
1.
Fill the EXPEDITE REPAIR & CALIBRATION FORM (found in Section I) and attach it
to the power meter. Please be as specific as possible about the nature of the
problem. Send a copy of any or all of the following information:
o
Any error messages that appeared on the power meter display.
o
Any information on the performance of the power meter.
2.
Use the original packaging materials or a strong shipping container. The carton
must be both large enough and strong enough to accommodate the power meter
and allow at least three to four inches on all sides of the power meter for packing
material.
3.
Surround the power meter with at least three to four inches of packing material or
enough to prevent the power meter from moving in the carton.
4.
Seal the shipping container securely with strong nylon adhesive tape.
5.
Mark the shipping container “FRAGILE, HANDLE WITH CARE” to ensure careful
handling.
Caution: Power meter damage can result from using packaging materials other than those
specified.
6.
Retain copies of all shipping papers.