Installation, putting into operation
33
4.4
Putting into operation
First, perform the steps specified at the
“Installation” chapter.
Check safe stand and stability of the system.
Check for proper mains power supply.
All of the system’s filters are to be installed correctly.
Turn on the system switching on the power switch (7).
The display on the front of the system turns on with a little delay (due to its self-test).
The system starts up by its own. When using the interface, its signal is dominant.
The turbine or fan speed can be adjusted by means of the +/- button or by the interface.
In case you experience any problems putting the system into operation, please have a look at the
chapters 5 and 7.