background image

EM-Technik GmbH - Industriestraße 2 - 67133 Maxdorf - Germany

[email protected]

www.em-technik.com

1

Inline Filter 7F400

Assembly and Operation Instructions

EN

Содержание 7F400

Страница 1: ...EM Technik GmbH Industriestraße 2 67133 Maxdorf Germany info em technik com www em technik com 1 Inline Filter 7F400 Assembly and Operation Instructions EN ...

Страница 2: ...ns 7F400TA 4 3 2 Dimensions 7F400FTC 4 3 3 Dimensions 7F400TAF 4 3 4 Dimensions 7F400TC 5 3 5 Dimensions 7F400TCF 5 3 6 Dimensions 7F400FTA 5 3 7 Dimensions 7F400TT 5 3 8 Operating Medium 6 3 9 Pressure Guide 6 3 10 KVs values 6 4 Assembly and Operation 6 4 1 Assembly Instructions 6 4 2 Tools Required 6 4 3 Connecting the Inline Filter 6 4 4 Torque Chart 7 4 5 Fastening Options 7 5 Commissioning 7...

Страница 3: ...ted Exercise caution for toxic corrosive or hot media residue flowing out of the line or remaining in dead spaces 1 4 General Safety Instructions The fitting must be properly connected to the flexible tube pipe system Before installing the fitting make certain that external mechanical effects such as thrust and bending forces are not acting on the flexible tube pipe system Installation commissioni...

Страница 4: ... direct sunlight Leave the fitting in its original packaging to ensure the best possible protection Dispose of the packaging material according to dispo sal requirements environmental protection regulations 3 Technical Data 3 1 Dimensions 7F400TA DN Ø D L L1 L2 SW 04 06 16 5 59 17 8 17 06 08 16 6 67 21 8 17 10 12 26 5 90 28 12 27 12 14 30 114 33 15 32 18 20 32 5 128 40 15 32 All data in mm 3 2 Dim...

Страница 5: ... 21 5 74 5 24 9 5 22 All data in mm 3 5 Dimensions 7F400TCF A B Ø D L1 l4 L SW1 04 06 G1 4 16 5 17 15 56 SW14 All data in mm 3 6 Dimensions 7F400FTA DN G Ø D L1 I4 L2 L SW SW1 04 06 1 4 16 5 17 15 34 59 14 14 All data in mm 3 7 Dimensions 7F400TT DN Ø D L1 L2 L SW SW1 04 19 21 8 70 17 17 06 19 23 8 74 17 17 08 24 23 9 5 74 22 22 10 24 27 9 5 82 22 22 All data in mm ...

Страница 6: ... must be suitable for the operating conditions of the pipeline system medium concentra tion temperature and pressure as well as the relevant ambient conditions Check the fitting for transport damage before installing it If the fitting is damaged do not install it The planner the construction company or operating company are responsible for the positioning and instal lation of the fitting Planning ...

Страница 7: ...ted pressure due to possible pressure surges Check the tightness and function of the fitting In new systems and after repairs flush the line system to remove foreign materials 6 Maintenance When used as designated the fitting is practically wear free and generally requires no maintenance The operating company must perform regular visual inspections of the fitting according to the operating conditi...

Страница 8: ...EC Based on the fluid class pressure and nominal diame ter our products fall under diagram 8 of the Pressure Equipment Directive PED 2014 68 EU Because of the ratio of nominal diameter pressure and volume they fall only under article 4 paragraph 3 and are designed and manufactured according to applicable good engi neering practice They must not carry any CE marking The warranty of armature expires...

Отзывы: