5-44
MAINTENANCE
6. Clean the primary element (3) with dried
compressed air (294 to 490 kPa or 43 to
71 psi).
First blow the air from the inside of the
element along the pleats. Then blow the
air from the outside and finally from the
inside again.
7. Light up the inside of the primary element
(3) with a light bulb, inspect it, and replace
it if there are small holes or thin spots.
8. Install the primary element (3).
9. Install the dust cup (2) with its “ TOP ”
mark facing up or by aligning the arrows
“ / ”, and then fasten it with the clamps
(1).
EVERY 250 HOURS
Содержание TB1160W
Страница 1: ......
Страница 11: ...1 1 SAFETY...
Страница 50: ...1 40 SAFETY SAFETY SIGNS DECALS...
Страница 51: ...1 41 SAFETY SAFETY SIGNS DECALS...
Страница 52: ...1 42 SAFETY SAFETY SIGNS DECALS...
Страница 53: ...2 1 CONTROLS...
Страница 127: ...3 1 OPERATION...
Страница 133: ...3 7 MEMO...
Страница 158: ...3 32...
Страница 159: ...4 1 TRANSPORT...
Страница 163: ...4 5 TRANSPORT Hoisting posture HOISTING THE MACHINE...
Страница 166: ...4 8...
Страница 167: ...5 1 MAINTENANCE...
Страница 246: ...5 80...
Страница 247: ...6 1 TROUBLESHOOTING...
Страница 249: ...6 3 MEMO...
Страница 257: ...6 11 MEMO...
Страница 273: ...7 1 SPECIFICATIONS...
Страница 275: ...7 3 MEMO...
Страница 276: ...7 4 SPECIFICATIONS MACHINE DIMENSIONS MACHINE DIMENSIONS...
Страница 278: ...7 6 SPECIFICATIONS OPERATING RANGES 2 Piece boom OPERATING RANGES...
Страница 280: ...7 8 MEMO...
Страница 282: ...7 10 SPECIFICATIONS 2 Piece boom 2570 mm 101 2 in arm LIFTING CAPACITIES...
Страница 283: ...7 11 SPECIFICATIONS 2 Piece boom 2570 mm 101 2 in arm LIFTING CAPACITIES...
Страница 284: ...7 12...
Страница 285: ...8 1 OPTIONS...
Страница 291: ...8 7 MEMO...