![background image](http://html1.mh-extra.com/html/takeuchi/tb1160w/tb1160w_operators-manual_3334848129.webp)
3-3
OPERATION
STARTING AND STOPPING
THE ENGINE
BEFORE STARTING THE ENGINE
1. Adjust the seat for a comfortable operating
position.
2. Fasten the seat belt.
STARTING AND STOPPING THE ENGINE
3. Check that the safety lock lever is in the
locked position.
4. Check that all levers and pedals are in the
neutral position.
5. Insert the key into the starter switch, turn it
to the ON position, and then perform the
following inspections:
· An alarm is sounded for two seconds.
The meters also start functioning. After
two seconds, only the battery charge
warning lamp (1), engine oil pressure
warning lamp (2) and third auxiliary
hydraulic warning lamp (3) start flashing,
and the other lamps turn off.
The battery charge warning lamp (1),
engine oil pressure warning lamp (2) and
third auxiliary hydraulic warning lamp (3)
remain lit until the engine starts.
· Turn the light switch to check that the all
lights/lamps are lit
· Check the fuel level.
If a lamp does not light or the alarm is not
sounded, the display or a wire may be
damaged. Ask your sales or service dealer
for repair.
Содержание TB1160W
Страница 1: ......
Страница 11: ...1 1 SAFETY...
Страница 50: ...1 40 SAFETY SAFETY SIGNS DECALS...
Страница 51: ...1 41 SAFETY SAFETY SIGNS DECALS...
Страница 52: ...1 42 SAFETY SAFETY SIGNS DECALS...
Страница 53: ...2 1 CONTROLS...
Страница 127: ...3 1 OPERATION...
Страница 133: ...3 7 MEMO...
Страница 158: ...3 32...
Страница 159: ...4 1 TRANSPORT...
Страница 163: ...4 5 TRANSPORT Hoisting posture HOISTING THE MACHINE...
Страница 166: ...4 8...
Страница 167: ...5 1 MAINTENANCE...
Страница 246: ...5 80...
Страница 247: ...6 1 TROUBLESHOOTING...
Страница 249: ...6 3 MEMO...
Страница 257: ...6 11 MEMO...
Страница 273: ...7 1 SPECIFICATIONS...
Страница 275: ...7 3 MEMO...
Страница 276: ...7 4 SPECIFICATIONS MACHINE DIMENSIONS MACHINE DIMENSIONS...
Страница 278: ...7 6 SPECIFICATIONS OPERATING RANGES 2 Piece boom OPERATING RANGES...
Страница 280: ...7 8 MEMO...
Страница 282: ...7 10 SPECIFICATIONS 2 Piece boom 2570 mm 101 2 in arm LIFTING CAPACITIES...
Страница 283: ...7 11 SPECIFICATIONS 2 Piece boom 2570 mm 101 2 in arm LIFTING CAPACITIES...
Страница 284: ...7 12...
Страница 285: ...8 1 OPTIONS...
Страница 291: ...8 7 MEMO...