![background image](http://html1.mh-extra.com/html/takeuchi/tb1160w/tb1160w_operators-manual_3334848070.webp)
2-18
CONTROLS
11. Hour meter /Trip meter
• Hour meter
Displays the total
engine running time in
hours.
The rightmost digit
indicates tenths of
hours (6 minutes).
Set the inspection and maintenance
intervals according to the time displayed
on the hour meter.
• Trip meter
Three patterns of desired operating hours
can be displayed.
Refer to “Trip meter setting” on page 2-29.
MULTI-INFORMATION DISPLAY
10. Engine load factor indicator
This gauge displays the load condition of the
work. When the gauge is in the green range,
the work load is light to medium. When the
gauge is in the red range (75% or more), the
work load is high. When the Enter key is
pressed in a normal screen, the display
changes in the following order: the engine
load factor, throttle opening position, PM
accumulation amount display, and lift load
factor.
Note:
The machine is not faulty if the gauge
is in the red range. Operating the machine
with the gauge being in the green range is
energy-saving and will help conserve the
global environment.
• The lift load factor is displayed if there is
no change in the throttle opening position
for five seconds after the lift alarm switch
is turned on.
• The throttle opening position is displayed if
there is a change in the throttle opening
position.
Содержание TB1160W
Страница 1: ......
Страница 11: ...1 1 SAFETY...
Страница 50: ...1 40 SAFETY SAFETY SIGNS DECALS...
Страница 51: ...1 41 SAFETY SAFETY SIGNS DECALS...
Страница 52: ...1 42 SAFETY SAFETY SIGNS DECALS...
Страница 53: ...2 1 CONTROLS...
Страница 127: ...3 1 OPERATION...
Страница 133: ...3 7 MEMO...
Страница 158: ...3 32...
Страница 159: ...4 1 TRANSPORT...
Страница 163: ...4 5 TRANSPORT Hoisting posture HOISTING THE MACHINE...
Страница 166: ...4 8...
Страница 167: ...5 1 MAINTENANCE...
Страница 246: ...5 80...
Страница 247: ...6 1 TROUBLESHOOTING...
Страница 249: ...6 3 MEMO...
Страница 257: ...6 11 MEMO...
Страница 273: ...7 1 SPECIFICATIONS...
Страница 275: ...7 3 MEMO...
Страница 276: ...7 4 SPECIFICATIONS MACHINE DIMENSIONS MACHINE DIMENSIONS...
Страница 278: ...7 6 SPECIFICATIONS OPERATING RANGES 2 Piece boom OPERATING RANGES...
Страница 280: ...7 8 MEMO...
Страница 282: ...7 10 SPECIFICATIONS 2 Piece boom 2570 mm 101 2 in arm LIFTING CAPACITIES...
Страница 283: ...7 11 SPECIFICATIONS 2 Piece boom 2570 mm 101 2 in arm LIFTING CAPACITIES...
Страница 284: ...7 12...
Страница 285: ...8 1 OPTIONS...
Страница 291: ...8 7 MEMO...