![background image](http://html1.mh-extra.com/html/takeuchi/tb1160w/tb1160w_operators-manual_3334848031.webp)
1-21
SAFETY
• Do not perform demolition work under the
machine. There is a hazard that the
machine may fall down, because the
ground becomes unstable.
• When working on or from the top of
buildings or other structures, check the
strength and the structure before starting
operations. If a building or structure
collapses, serious injury or damage will
result.
PRECAUTIONS WHEN OPERATING
• When doing demolition work, do not
perform demolition above your head. There
is a hazard of broken parts falling or of the
building collapsing and causing serious
injury or damage.
• Do not use the impact force of the hoe
attachment for breaking work. There is a
hazard of serious injury being caused by
flying pieces of broken materials and by the
damaged hoe attachment.
Содержание TB1160W
Страница 1: ......
Страница 11: ...1 1 SAFETY...
Страница 50: ...1 40 SAFETY SAFETY SIGNS DECALS...
Страница 51: ...1 41 SAFETY SAFETY SIGNS DECALS...
Страница 52: ...1 42 SAFETY SAFETY SIGNS DECALS...
Страница 53: ...2 1 CONTROLS...
Страница 127: ...3 1 OPERATION...
Страница 133: ...3 7 MEMO...
Страница 158: ...3 32...
Страница 159: ...4 1 TRANSPORT...
Страница 163: ...4 5 TRANSPORT Hoisting posture HOISTING THE MACHINE...
Страница 166: ...4 8...
Страница 167: ...5 1 MAINTENANCE...
Страница 246: ...5 80...
Страница 247: ...6 1 TROUBLESHOOTING...
Страница 249: ...6 3 MEMO...
Страница 257: ...6 11 MEMO...
Страница 273: ...7 1 SPECIFICATIONS...
Страница 275: ...7 3 MEMO...
Страница 276: ...7 4 SPECIFICATIONS MACHINE DIMENSIONS MACHINE DIMENSIONS...
Страница 278: ...7 6 SPECIFICATIONS OPERATING RANGES 2 Piece boom OPERATING RANGES...
Страница 280: ...7 8 MEMO...
Страница 282: ...7 10 SPECIFICATIONS 2 Piece boom 2570 mm 101 2 in arm LIFTING CAPACITIES...
Страница 283: ...7 11 SPECIFICATIONS 2 Piece boom 2570 mm 101 2 in arm LIFTING CAPACITIES...
Страница 284: ...7 12...
Страница 285: ...8 1 OPTIONS...
Страница 291: ...8 7 MEMO...