![background image](http://html1.mh-extra.com/html/takeuchi/tb1160w/tb1160w_operators-manual_3334848147.webp)
3-21
OPERATION
When using the dozer blade to stabilize or
raise the machine, lower the both ends of
the blade to the ground.
Pay attention to the dozer blade when
digging
When digging deeply with the dozer blade
positioned at the front, be careful that the
boom cylinder and bucket do not hit the
dozer blade.
Operate with the dozer blade at the rear
whenever possible.
Caution on digging down with the dozer
blade
This dozer blade is designed for simple earth
pushing. Do not dig down deeply with the
dozer blade. Doing so could damage the
dozer blade and undercarriage.
Caution on folding the hoe attachment
Be careful not to let the bucket hit the dozer
blade when the hoe attachment is being
folded.
Be careful about the hoe attachment
interference
OPERATING PROCEDURES
When lowering the hoe attachment, be
careful not to let it hit the undercarriage or
dozer blade. Also, make sure that the boom
cylinder hose does not contact the chassis.
Do not support the machine with one side
of the blade.
Содержание TB1160W
Страница 1: ......
Страница 11: ...1 1 SAFETY...
Страница 50: ...1 40 SAFETY SAFETY SIGNS DECALS...
Страница 51: ...1 41 SAFETY SAFETY SIGNS DECALS...
Страница 52: ...1 42 SAFETY SAFETY SIGNS DECALS...
Страница 53: ...2 1 CONTROLS...
Страница 127: ...3 1 OPERATION...
Страница 133: ...3 7 MEMO...
Страница 158: ...3 32...
Страница 159: ...4 1 TRANSPORT...
Страница 163: ...4 5 TRANSPORT Hoisting posture HOISTING THE MACHINE...
Страница 166: ...4 8...
Страница 167: ...5 1 MAINTENANCE...
Страница 246: ...5 80...
Страница 247: ...6 1 TROUBLESHOOTING...
Страница 249: ...6 3 MEMO...
Страница 257: ...6 11 MEMO...
Страница 273: ...7 1 SPECIFICATIONS...
Страница 275: ...7 3 MEMO...
Страница 276: ...7 4 SPECIFICATIONS MACHINE DIMENSIONS MACHINE DIMENSIONS...
Страница 278: ...7 6 SPECIFICATIONS OPERATING RANGES 2 Piece boom OPERATING RANGES...
Страница 280: ...7 8 MEMO...
Страница 282: ...7 10 SPECIFICATIONS 2 Piece boom 2570 mm 101 2 in arm LIFTING CAPACITIES...
Страница 283: ...7 11 SPECIFICATIONS 2 Piece boom 2570 mm 101 2 in arm LIFTING CAPACITIES...
Страница 284: ...7 12...
Страница 285: ...8 1 OPTIONS...
Страница 291: ...8 7 MEMO...