![background image](http://html1.mh-extra.com/html/takeuchi/tb1160w/tb1160w_operators-manual_3334848104.webp)
2-52
CONTROLS
LEVERS AND PEDALS
OPERATING LEVERS
• Before starting operation, carefully
check which lever pattern you are going
to use.
• It is described using the ISO pattern in
this manual.
Use these levers to operate the boom, arm,
bucket and upperstructure.
Refer to “Lever pattern” on page 3-6.
Refer to “Operating the working equipment”
on page 3-16.
BLADE LEVER
Use this lever to operate the dozer blade.
(A) .......Blade up
(B) ......Blade down
Refer to “Operating the dozer blade” on
page 3-18.
BLADE /OUTRIGGER LEVER
(IF EQUIPPED)
Use this lever to operate the dozer blade or
the outrigger (if equipped).
Use the outrigger switch to select the dozer
blade or outrigger operation.
(A) .......Blade raise /Outriggers raise
(B) ......Blade lower /Outriggers lower
Refer to “Outrigger switches (If equipped)”
on page 2-44.
Refer to “Operating the dozer blade” and
“Operating the outriggers (If equipped)” on
page 3-18.
Содержание TB1160W
Страница 1: ......
Страница 11: ...1 1 SAFETY...
Страница 50: ...1 40 SAFETY SAFETY SIGNS DECALS...
Страница 51: ...1 41 SAFETY SAFETY SIGNS DECALS...
Страница 52: ...1 42 SAFETY SAFETY SIGNS DECALS...
Страница 53: ...2 1 CONTROLS...
Страница 127: ...3 1 OPERATION...
Страница 133: ...3 7 MEMO...
Страница 158: ...3 32...
Страница 159: ...4 1 TRANSPORT...
Страница 163: ...4 5 TRANSPORT Hoisting posture HOISTING THE MACHINE...
Страница 166: ...4 8...
Страница 167: ...5 1 MAINTENANCE...
Страница 246: ...5 80...
Страница 247: ...6 1 TROUBLESHOOTING...
Страница 249: ...6 3 MEMO...
Страница 257: ...6 11 MEMO...
Страница 273: ...7 1 SPECIFICATIONS...
Страница 275: ...7 3 MEMO...
Страница 276: ...7 4 SPECIFICATIONS MACHINE DIMENSIONS MACHINE DIMENSIONS...
Страница 278: ...7 6 SPECIFICATIONS OPERATING RANGES 2 Piece boom OPERATING RANGES...
Страница 280: ...7 8 MEMO...
Страница 282: ...7 10 SPECIFICATIONS 2 Piece boom 2570 mm 101 2 in arm LIFTING CAPACITIES...
Страница 283: ...7 11 SPECIFICATIONS 2 Piece boom 2570 mm 101 2 in arm LIFTING CAPACITIES...
Страница 284: ...7 12...
Страница 285: ...8 1 OPTIONS...
Страница 291: ...8 7 MEMO...