![background image](http://html1.mh-extra.com/html/takeuchi/tb1160w/tb1160w_operators-manual_3334848143.webp)
3-17
OPERATION
OPERATING THE MACHINE
Operating the arm
Arm in:
Tilt the left operating lever backward.
Arm out:
Tilt the left operating lever forward.
Operating the bucket
Bucket load:
Tilt the right operating lever to the left.
Bucket dump:
Tilt the right operating lever to the right.
Operating the second boom
Second boom raise:
Step on the toe side of the pedal.
Second boom lower:
Step on the heel side of the pedal.
Operating the dozer blade
For machines with outriggers, select the
dozer blade operation with the outrigger
switch.
Dozer blade lower:
Tilt the blade lever forward.
Dozer blade raise:
Tilt the blade lever backward.
Содержание TB1160W
Страница 1: ......
Страница 11: ...1 1 SAFETY...
Страница 50: ...1 40 SAFETY SAFETY SIGNS DECALS...
Страница 51: ...1 41 SAFETY SAFETY SIGNS DECALS...
Страница 52: ...1 42 SAFETY SAFETY SIGNS DECALS...
Страница 53: ...2 1 CONTROLS...
Страница 127: ...3 1 OPERATION...
Страница 133: ...3 7 MEMO...
Страница 158: ...3 32...
Страница 159: ...4 1 TRANSPORT...
Страница 163: ...4 5 TRANSPORT Hoisting posture HOISTING THE MACHINE...
Страница 166: ...4 8...
Страница 167: ...5 1 MAINTENANCE...
Страница 246: ...5 80...
Страница 247: ...6 1 TROUBLESHOOTING...
Страница 249: ...6 3 MEMO...
Страница 257: ...6 11 MEMO...
Страница 273: ...7 1 SPECIFICATIONS...
Страница 275: ...7 3 MEMO...
Страница 276: ...7 4 SPECIFICATIONS MACHINE DIMENSIONS MACHINE DIMENSIONS...
Страница 278: ...7 6 SPECIFICATIONS OPERATING RANGES 2 Piece boom OPERATING RANGES...
Страница 280: ...7 8 MEMO...
Страница 282: ...7 10 SPECIFICATIONS 2 Piece boom 2570 mm 101 2 in arm LIFTING CAPACITIES...
Страница 283: ...7 11 SPECIFICATIONS 2 Piece boom 2570 mm 101 2 in arm LIFTING CAPACITIES...
Страница 284: ...7 12...
Страница 285: ...8 1 OPTIONS...
Страница 291: ...8 7 MEMO...