
Sentinel Pro Installation Procedure and Reference Manual
- for Coral IPx / FlexiCom
Hardware Installation
23
Mounting the Sentinel
Pr
o Unit
4
................................................................................................................
Mounting the Sentinel Pro Unit
Prior to mounting the Sentinel Pro unit, verify that the installation area is located no
closer than 20 ft. (6.1m) from electric devices that produce large electro-magnetic
fields or high levels of radio frequency energy. Possible sources are radio transmitters,
electric arc welding machines, copying machines, electric motors, refrigeration units,
power transformers, electric load centers, and main circuit breaker panels.
To mount the unit onto a table:
Peel off five rubber bumpers provided and affix them onto the bottom panel of
the Sentinel Pro unit, as shown in
.
Attaching the rubber bumpers on to the bottom panel of the Sentinel Pro unit
increases the height of the unit by approximately 0.16” (4mm).
Figure 10 Table Mounting
Bumpers
The side panels include ventilation holes that allow cool air flow into the cage. If
these holes are blocked, cool air cannot enter the cage. Heat build-up could cause a
fire. Make sure there is empty space of at least 2U between the Sentinel Pro side
panels and other equipment.
1
3
2
4
5
Attach rubber bumpers
onto five marked positions
on the bottom panel
Содержание Coral Sentinel Pro
Страница 1: ...Coral Sentinel Pro Installation Procedure and Reference Manual Version 6 78 Document Edition 3 2...
Страница 56: ...NOTES...
Страница 62: ...NOTES...
Страница 70: ...NOTES...
Страница 71: ......
Страница 72: ......