Preparatory Steps
◆
For detailed information on the individual procedures,
refer to the sections shown in parentheses.
1.
Perform pre-operational inspection.
(“Pre-operational and Periodic Inspection”
………
P. 132)
2.
Enter the cab, and adjust the seat and each lever
stand so that the levers and all other controls can be op-
erated easily.
(“Crane Operator’s Cab”
……………………………
P. 66)
3.
Make sure that the controls in the crane operator’s
cab are in the following positions:
(1) Main and auxiliary hoist levers, boom telescoping
lever, boom elevating lever and swing lever
…
Neutral
(2) Swing brake switch
………………………………
“ON”
(3) Swing stop override switch
…………………
Activated
(4) Slow elevation stop switch
…………………
Activated
(5) Emergency outrigger control switch
……………
“OFF”
4.
Start the engine by using the starter switch in the
carrier driver’s cab.
(“Starting and Stopping the Engine”
………………
P. 54)
5.
Engage the PTO.
(“Operating the PTO and Warming Up the Machine”
……………………………………………………
P. 57)
6.
Let the machine warm up. While it is warming up,
check that all meter and monitor displays are normal
and that the machine is not making any abnormal
sounds.
(“Operating the PTO and Warming Up the Machine”
……………………………………………………
P. 57)
7.
Fully extend the outriggers and level the crane.
(“Outriggers”
…………………………………………
P. 58)
8.
Extend the front jack.
(“Outriggers”
…………………………………………
P. 58)
Crane Operation Procedure—
Summary
T038280E
13
Crane Operation Procedure—Summary
Crane Operation Procedure—Summary
WARNING
This summary describes briefly the essential
steps for crane operation from start to finish. For
detailed information on the individual procedures,
refer to the appropriate pages in this section of
the manual. Do not operate the crane until you
have a complete understanding of all the instruc-
tions and information given in this section.
The precautions you must observe during crane
operation are described in the "Safety" section at
the beginning of this manual. Carefully read the
section before operating the crane.
If you find anything abnormal with the crane
during operation, stop the operation immediately,
check and locate the cause, and repair any faulty
components. To prevent accidents, do not operate
the crane until repairs have been completed.
OFF
ON
AML
MIKUNI
MIKUNI
MY30
FU
E
L
L
H
JIB LOCK
AML
50
℃
85
℃
ON
INT
FREE
4
D E F
MODE
COOL
HOT
O N
O F F
A / C
R / F
ON
ON
ON
INT
3B
〜
2B
5
3
2
1
1
T24037
T23069E
Lever stand
Unlock lever
Stowage position
(for traveling)
Position for crane operation
Содержание GT-550E-2
Страница 20: ...A 19 Safety Rules Safety Rules...
Страница 23: ...A 22 Safety Rules Safety Rules...
Страница 29: ...A 28 Safety Rules Safety Rules...
Страница 30: ...A 29 Warning Labels Warning Labels...
Страница 32: ...A 31 Warning Labels Warning Labels 1 2 3 JIB PIN STATUS...
Страница 36: ...1 Contents Contents...
Страница 37: ...2 Contents Contents...
Страница 38: ......
Страница 41: ...6 Layout of Controls Layout of Controls of Controls Layo out...
Страница 46: ...H000450E OPERATION...
Страница 73: ......