Outrigger Operations for Traveling a
Small Distance
1.
Set the crane as in the above described warning.
2.
If the front jack is already extended, retract it.
3.
Perform the jack stowing operation until the jack
floats are raised slightly from the ground.
4.
Travel slowly at the speed below 5 km/h paying at-
tention to the surroundings.
5.
After traveling, set the outriggers immediately.
T039000E
12
Carrier Traveling Procedure—Summary
Carrier Traveling Procedure—Summary
If the crane is moved without proper traveling
precautions, it may overturn.
For traveling without setting the crane in traveling
configuration, make the following preparations for
preventing overturning:
•
Make sure that the tire air pressure is kept at the
specified value (850 kPa [8.5 kgf/cm
2
]). If the air
pressure is not insufficient, inflate the tires.
•
Retract the boom fully (to the length of 11.1 m),
set the boom angle to 45°, retract the jib fully (to
the length of 9.0 m), and set the jib offset angle
to 5°.
•
Orient the boom directly forward or backward
and fix it with the swing lock pin before applying
the swing brake.
•
Observe the specified boom elevation angle. For
detailed information, refer to the “Weight
Distribution Chart” in the INFORMATION AND
DATA section.
To prevent overturning, do not travel with a
load hoisted.
To prevent overturning, do not perform crane
operation during traveling.
Do not travel on the soft ground. Otherwise the
tires may fall in the ground and the crane may
overturn.
For safety, avoid starting or stopping sudden-
ly.
WARNING
Outrigger Operations for Traveling a
Small Distance
•
Make sure that the tire air pressure is kept at the
specified value (850 kPa [8.5 kgf/cm
2
]). If the air
pressure is not insufficient, inflate the tires.
•
Retract the boom fully (to the length of 11.1 m),
set the boom angle to 45°, retract the jib fully (to
the length of 9.0 m), and set the jib offset angle
to 5°.
•
Orient the boom directly forward or backward
and fix it with the swing lock pin before applying
the swing brake.
To prevent overturning, do not travel with a
load hoisted.
2.
If the front jack is already extended, retract it.
3.
Perform the jack stowing operation until the jack
floats are raised slightly from the ground.
4.
Travel slowly at the speed below 5 km/h paying at-
tention to the surroundings.
Содержание GT-550E-2
Страница 20: ...A 19 Safety Rules Safety Rules...
Страница 23: ...A 22 Safety Rules Safety Rules...
Страница 29: ...A 28 Safety Rules Safety Rules...
Страница 30: ...A 29 Warning Labels Warning Labels...
Страница 32: ...A 31 Warning Labels Warning Labels 1 2 3 JIB PIN STATUS...
Страница 36: ...1 Contents Contents...
Страница 37: ...2 Contents Contents...
Страница 38: ......
Страница 41: ...6 Layout of Controls Layout of Controls of Controls Layo out...
Страница 46: ...H000450E OPERATION...
Страница 73: ......