Y-6
Y-6
Assembly Adjustment (Crane Operation)
34
WY05-4490E
3. Tighten the two nuts-
C
equally until the top boom section extends by 1 to 5 mm (0.04 to 0.2 in) from the 4th
boom section.
4. Tighten the nut-
A
until the top and 4th boom sections are fully retracted.
5. Extend the boom by 200 to 300 mm (8 to 12 in) by operating the boom telescoping control lever and then
retract it fully. Check the boom is fully retracted.
END
NG
OK
Содержание GR-500EXL-3
Страница 1: ......
Страница 8: ...7 WA04 4610E 6 Group index System Diagrams Data Adjustment and Checks Y Z Y Z...
Страница 96: ...Z 6 Z 6 Hydraulic Parts Location Diagram Upper 25 WZ07 3970E 5 Return 6 Drain 4 343 466 14000 3 343 466 15000...
Страница 102: ...Z 7 Z 7 Hydraulic Parts Location Diagram Lower 31 WZ07 3950E 2 Steering 2 346 418 02000...
Страница 107: ...Z 9 Z 9 Pneumatic Parts Location Diagram 36 WZ08 0590E 2 Service brake related lower 7 349 232 70000...
Страница 108: ...37 WZ08 0590E Z 9 Z 9 Pneumatic Parts Location Diagram 3 Control parts lower 4 349 232 60000...