Y-6
Y-6
Assembly Adjustment (Crane Operation)
33
WY05-4490E
Y-6 Assembly Adjustment (Crane Operation)
1. Adjusting boom telescoping wire ropes
1. With the boom fully retracted, tighten the nut-
A
until a tension is placed on the top boom section retraction
wire rope (to keep the boom fully retracted).
2. Tighten the four nuts-
B
equally until the 4th boom section extends by 1 to 5 mm (0.04 to 0.2 in) from the 3rd
boom section.
Содержание GR-500EXL-3
Страница 1: ......
Страница 8: ...7 WA04 4610E 6 Group index System Diagrams Data Adjustment and Checks Y Z Y Z...
Страница 96: ...Z 6 Z 6 Hydraulic Parts Location Diagram Upper 25 WZ07 3970E 5 Return 6 Drain 4 343 466 14000 3 343 466 15000...
Страница 102: ...Z 7 Z 7 Hydraulic Parts Location Diagram Lower 31 WZ07 3950E 2 Steering 2 346 418 02000...
Страница 107: ...Z 9 Z 9 Pneumatic Parts Location Diagram 36 WZ08 0590E 2 Service brake related lower 7 349 232 70000...
Страница 108: ...37 WZ08 0590E Z 9 Z 9 Pneumatic Parts Location Diagram 3 Control parts lower 4 349 232 60000...