Y-6
Y-6
Assembly Adjustment (Crane Operation)
35
WY05-4490E
6. Check the tension of the two 4th boom section extension wire ropes.
7. When the wire rope is slack:
8. When the wire rope is tense:
7.1 Tighten the two nuts-
B
by approximately a third turn equally.
7.2 Extend the boom by 200 to 300 mm (8 to 12 in) by operating the boom telescoping
control lever and then retract it fully. Check the boom is fully retracted.
OK
END
NG
8.1 Tighten nut-
A
by approximately a third turn.
8. When the wire rope is tense:
8.2 Extend the boom by 200 to 300 mm (8 to 12 in) by operating the boom telescoping
control lever and then retract it fully. Check the boom is fully retracted.
NG
OK
END
NG
Содержание GR-500EXL-3
Страница 1: ......
Страница 8: ...7 WA04 4610E 6 Group index System Diagrams Data Adjustment and Checks Y Z Y Z...
Страница 96: ...Z 6 Z 6 Hydraulic Parts Location Diagram Upper 25 WZ07 3970E 5 Return 6 Drain 4 343 466 14000 3 343 466 15000...
Страница 102: ...Z 7 Z 7 Hydraulic Parts Location Diagram Lower 31 WZ07 3950E 2 Steering 2 346 418 02000...
Страница 107: ...Z 9 Z 9 Pneumatic Parts Location Diagram 36 WZ08 0590E 2 Service brake related lower 7 349 232 70000...
Страница 108: ...37 WZ08 0590E Z 9 Z 9 Pneumatic Parts Location Diagram 3 Control parts lower 4 349 232 60000...