8
WA04-4880E
Foreword
7. Contents
Chapt
er
Section
Spec. No.
GR-300E-3-00102
2M2D
(General Export)
Data, Adjustment and Checks
Y
Service Data
Y-1
Adjusting pressure (Hydraulic Pressure)
Y-2
Adjusting pressure (Pneumatic Pressure)
Y-3
Air Bleeding Procedure
Y-4
Adjusting procedure (Electric)
Y-5
Assembly Adjustment (Crane Operation)
Y-6
Assembly Adjustment (Traveling Device)
Y-7
Operation Check (Crane Operation)
Y-8
Operation Check (Traveling Device)
Y-9
Inspection and Maintenance
Y-10
Boom Connecting Pin and Thread Size
Table
Y-11
System Diagrams
Z
Hydraulic Circuit
Z-1
Torque Converter Circuit
Z-2
Pneumatic Circuit
Z-3
Electric Circuit (Upper)
Z-4
Electric Circuit (Lower)
Z-5
Содержание GR-300EX-3
Страница 1: ......
Страница 8: ...7 WA04 4880E 6 Group index System Diagrams Data Adjustment and Checks Y Z Y Z...
Страница 27: ...14 WY02 1792E Y 2 Y 2 Adjusting Pressure Hydraulic Pressure...
Страница 97: ...Z 6 Z 6 Hydraulic Parts Location Diagram Upper 26 WZ07 3762E 5 Return 6 Drain 3 343 458 62000 1 343 465 03000...
Страница 98: ...Z 6 Z 6 Hydraulic Parts Location Diagram Upper 27 WZ07 3762E 7 Gauge 3 343 450 35500...
Страница 99: ...Z 6 Z 6 Hydraulic Parts Location Diagram Upper 28 WZ07 3762E 8 Pilot 0 343 458 63000...
Страница 108: ...37 WZ08 0620E Z 9 Z 9 Pneumatic Parts Location Diagram 3 Control parts lower 1 349 233 11000 0 349 233 10000...