Y-8
Y-8
Operation Check (Crane Operation)
43
WY05-4780E
Y-8 Operation Check
(Crane Operation)
1. Outrigger status indicator
Main switch : ON
Shift lever : Not in N position
Operate the outrigger extend/retract selector switch.
Icon flashes on the AML display.
Press all outrigger control switch.
Outriggers do not operate.
Main switch : ON
Shift lever : N position
Operate the outrigger extend/retract selector switch.
Icon flashes on the AML display.
Press all outrigger control switch.
Outriggers operate.
Содержание GR-300EX-3
Страница 1: ......
Страница 8: ...7 WA04 4880E 6 Group index System Diagrams Data Adjustment and Checks Y Z Y Z...
Страница 27: ...14 WY02 1792E Y 2 Y 2 Adjusting Pressure Hydraulic Pressure...
Страница 97: ...Z 6 Z 6 Hydraulic Parts Location Diagram Upper 26 WZ07 3762E 5 Return 6 Drain 3 343 458 62000 1 343 465 03000...
Страница 98: ...Z 6 Z 6 Hydraulic Parts Location Diagram Upper 27 WZ07 3762E 7 Gauge 3 343 450 35500...
Страница 99: ...Z 6 Z 6 Hydraulic Parts Location Diagram Upper 28 WZ07 3762E 8 Pilot 0 343 458 63000...
Страница 108: ...37 WZ08 0620E Z 9 Z 9 Pneumatic Parts Location Diagram 3 Control parts lower 1 349 233 11000 0 349 233 10000...