Y-5
Y-5
Adjusting Procedure (Electric)
30
WY04-2172E
Y-5 Adjusting Procedure
(Electric)
1. 3rd/top boom full retraction detection
switch (CN859)
Adjust the switch position so that its contact is
shifted (opened/closed) when the top boom section
is extended/retracted. The position is 5 to 8 mm (0.2
to 0.31 in) longer than its fully retracted length.
(*1): Switch fixing bolt tightening torque
: 4 to 6 N-m (41 to 61 kgf-cm) (3 to 4.4 ft-lbf)
2. Jib stowed detection switch (CN572)
Adjust the switch position so that the dimension A
becomes 4
+0.5
0
mm (0.16
+0.02
0
in) with the jib stowed.
(*1):
•
Apply a thread locking agent (ThreeBond 1401
or the equivalent) to the threaded section of
the switch.
•
Switch fixing nut tightening torque
: 40 to 50 N-m (410 to 510 kgf-cm)
(29.5 to 36.9 ft-lbf)
[NOTICE]
Make sure that the red LED lights up when the
switch is activated.
△
7
343-628-92000
△
3
343-548-72100
Содержание GR-300EX-3
Страница 1: ......
Страница 8: ...7 WA04 4880E 6 Group index System Diagrams Data Adjustment and Checks Y Z Y Z...
Страница 27: ...14 WY02 1792E Y 2 Y 2 Adjusting Pressure Hydraulic Pressure...
Страница 97: ...Z 6 Z 6 Hydraulic Parts Location Diagram Upper 26 WZ07 3762E 5 Return 6 Drain 3 343 458 62000 1 343 465 03000...
Страница 98: ...Z 6 Z 6 Hydraulic Parts Location Diagram Upper 27 WZ07 3762E 7 Gauge 3 343 450 35500...
Страница 99: ...Z 6 Z 6 Hydraulic Parts Location Diagram Upper 28 WZ07 3762E 8 Pilot 0 343 458 63000...
Страница 108: ...37 WZ08 0620E Z 9 Z 9 Pneumatic Parts Location Diagram 3 Control parts lower 1 349 233 11000 0 349 233 10000...