![TA DTC-300 Скачать руководство пользователя страница 23](http://html1.mh-extra.com/html/ta/dtc-300/dtc-300_getting-started-manual_4369174023.webp)
DTC-300 Getting Started Guide
Page 23
Chapter 3:
Operating the DTC-300
Using the DTC-300
All of your DTC-300 experiments will have the following general outline. In some cases, not all of these
steps will be performed.
•
Preparing the sample
•
Loading the sample
•
Starting the analysis
To obtain accurate results, follow these procedures carefully.
Before You Begin
Before you set up an experiment, ensure that the DTC-300 system has been installed properly. Make sure
you have:
•
Connected all coolant and pneumatic/purge gas lines
•
Connected the communication cables from the rear of the instrument to the control computer
•
Powered up the unit
•
Become familiar with instrument operations
•
Become familiar with the software
Startup and Shutdown Procedures
Starting the DTC-300 System
The power switch is located on the back panel of the DTC-300. The power switch is used to turn the DTC-
300 system on and off.
To power on the system:
1
Check that the power cord is plugged into the
MAIN POWER
socket on the real panel of the DTC-300
and connected to an electrical outlet in accordance with the electrical ratings on the back panel of the
instrument.
2
Set the
HEATER POWER
switch on the front panel to the OFF (
0
) position.
3
Set the DTC-300
MAIN POWER
switch to the ON
(
I
)
position.
4
The temperature controllers on the front panel indicate that main power to the instrument is active.