2
Contents
A.
MANUFACTURER
....................................................................................................................................
9
B.
NAME
OF
MACHINES..............................................................................................................................
9
C.
DECLARATION
OF
CONFORMITY
‐
EXAMPLE
.............................................................................
10
D.
GENERAL
DESCRIPTIONS,
DANGERS
AND
WARNINGS
...........................................................
11
d.1
Overview
via
pictograms
on
the
inspection
side
of
the
unit
..........................................................
11
d.1.1
Where
are
pictograms
placed
on
the
units
............................................................................
12
d.1.2
Label
with
production
number
..............................................................................................
13
d.1.3
Pictogram
on
a
door
for
a
fan
in
a
DV
unit
.............................................................................
13
d.1.4
Pictograms
for
all
available
functions
in
the
units
..................................................................
14
d.1.5
Pictograms
about
warnings
and
dangers
on
the
units
............................................................
16
d.2
Data
about
the
unit
according
to
cards
and
labels
in
and
on
the
unit
............................................
17
d.2.1
Machine
card
with
unique
data
on
every
unit
.......................................................................
17
d.
3
Dimensions
of
the
units
.............................................................................................................
18
d.4
About
operation
and
control.
......................................................................................................
18
d.
5
Warnings
about
dangers
............................................................................................................
18
E.
DRAWINGS,
DIAGRAMS,
GUIDES
AND
INSTRUCTIONS
FOR
THE
USE,
MAINTENANCE
AND
REPAIR
...............................................................................................................................................
18
F.
EMPLOYEES
IN
CHARGE
OF
OPERATION/CONTROL/MAINTENANCE
...............................
19
G.
INTENDED
USE
AND
RANGE
OF
APPLICATIONS
.......................................................................
19
H.
UNINTENDED
USE
AND
MISUSE
–
INAPPROPRIATE
APPLICATIONS
FOR
THE
MACHINE
........................................................................................................................................................................
19
h.1
Air
handling
unit
in
operation
.....................................................................................................
19
I.
INSTRUCTIONS
FOR
UNLOADING
ON
THE
SITE
AS
WELL
AS
INSTALLATION
AND
CONNECTION
.............................................................................................................................................
20
i.1.
Unloading
on
the
site
..................................................................................................................
20
i.1.1
Unloading
by
fork
‐
lift
truck.
...................................................................................................
20
i.1.2
Unloading
by
crane
...............................................................................................................
20
i.1.3
Transport
of
unit
without
base
frame
on
the
site
...................................................................
20
i.1.4
Lifting
a
unit
with
straps
........................................................................................................
20
i.1.5
Lifting
a
unit
with
preinstalled
brackets
on
the
base
frame
for
lifting.
.....................................
21
i.1.6
Roof
unit
with
bitumen
roof
..................................................................................................
21
Содержание Danvent DV-10
Страница 16: ...15 DVE Plug fan DVD Silencer DVX Humidifier...
Страница 57: ...56...
Страница 58: ...57 Annex for the User Manual Air Handling Units Danvent DV Without control system Version 1 01 13...
Страница 84: ...8 8...
Страница 88: ...9 4 9 1 3 Information about connection of cables to terminals on the control board...
Страница 91: ...9 7...
Страница 92: ...9 8 A1 Size Quantity Length mm DV 60 4 1014 DV 80 4 1164 DV 100 4 1314 DV 120 4 1464 DV 150 4 1614 A1...
Страница 94: ...9 10 9 3 Assemble divided rotor from Hoval Enventus for DV 60 DV 80 and DV 100 9 3 1 Tools and aids 0 100Nm 3 3...
Страница 103: ...9 19...
Страница 111: ...12 3...
Страница 115: ...12 7 Frequency converter is always necessary for the control of each PM motor...
Страница 119: ...13 1 Annex 13 Commissioning See separate cover with annexes 1 2 3 and 13...