A-96.250.231 / 130421
AMI Turbitrack
Maintenance
37
2
Turn the lever located on the solenoid valve upwards to empty
the flow cell.
3
Turn the cover [A] out of the bayonet connection and remove it
from the measuring chamber [B].
4
Clean the measuring chamber using a clean, soft tissue.
5
Clean the optical elements [C], [D] and [E] with another soft,
clean tissue.
6
Close the measuring chamber with the cover.
7
Open the sample inlet valve.
6.3. Cleaning the Test Unit
Note:
To avoid scratches on the surface of the test unit, do not
use scrubbing materials.
After each verification dry the test unit with a soft, clean tissue.