![Swan Analytical Instruments AMI Codes-II TC Скачать руководство пользователя страница 23](http://html1.mh-extra.com/html/swan-analytical-instruments/ami-codes-ii-tc/ami-codes-ii-tc_operators-manual_1411375023.webp)
AMI Codes-II TC
Installation
A-96.250.631 / 280219
21
To install the constant head tube proceed as follows:
1
Unpack the constant head tube [C].
2
Push the constant head tube into the flow cell block [E].
3
Put the constant head cover [A] onto the constant head tube.
4
Check if the overflow tube [B] is aligned with the upper level
mark.
A
B
C
D
E
Constant head cover
Overflow tube
Constant head tube
Gasket
Flow cell block
Level
A
B
E
D
C