![Suzuki DF 40 Скачать руководство пользователя страница 396](http://html.mh-extra.com/html/suzuki/df-40/df-40_service-manual_1408856396.webp)
DF40QH / DF50QH
25
INSTALLATION
Installation is reverse order of removal with special attention
to the following steps.
Tiller handle assembly
• Install three (3) nylon bushes
1
into tiller handle mounting
hole and set tiller handle
2
on handle bracket.
• Place three (3) washers
3
and spring
4
into position.
Insert handle pivot bolt
5
.
Coat pivot bolt threads with thread lock and tighten pivot
bolt to specified torque.
@
@
@
@
@
Handle pivot bolt: 45 N.m (4.5 kg-m, 32.5 lb.-ft.)
h
h
h
h
h
99000-32050: Thread Lock 1342
• Install washer
6
, nut
7
and tighten nut to specified torque.
@
@
@
@
@
Handle pivot nut: 45 N.m (4.5 kg-m, 32.5 lb.-ft.)
Handle wire harness
Route the handle wire harness
1
as shown in figure.
Connect handle wire harness connector to engine wiring har-
ness
2
.
Содержание DF 40
Страница 1: ...99500 87J00 01E ...
Страница 108: ......
Страница 149: ...POWER UNIT 6 6 Remove eight bolts and nut Lift up and remove power unit from engine holder ...
Страница 263: ...10 1 WIRE HOSE ROUTING WIRING DIAGRAM DF40T DF50T ...
Страница 272: ... _ _ r ...
Страница 279: ......
Страница 367: ... ...
Страница 369: ...99501 87J00 01E OUTBOARD MOTOR Printed in Japan TK ...
Страница 405: ...Prepared by Marine Power Products Division 1 st Ed January 1999 Manual No 99501 87J00 01E Printed in Japan 36 ...