![Suzuki DF 40 Скачать руководство пользователя страница 163](http://html.mh-extra.com/html/suzuki/df-40/df-40_service-manual_1408856163.webp)
POWER UNIT 6-20
(10) Install timing chain tensioner link
5
.
(11) Pull out stopper from adjuster.
(12) Turn crankshaft normal running direction 2 revolutions and
check that match marks are aligned as shown in figure.
(13) Install oil pump case.
(See page 6-12)
(14) Install under oil seal housing.
(See page 6-14)
1
2
1. Match mark (slit) on camshaft sprocket
2. Match mark (rib) on cylinder head
3. Match mark on crank shaft
4. Match mark on crankcase
4
3
Содержание DF 40
Страница 1: ...99500 87J00 01E ...
Страница 108: ......
Страница 149: ...POWER UNIT 6 6 Remove eight bolts and nut Lift up and remove power unit from engine holder ...
Страница 263: ...10 1 WIRE HOSE ROUTING WIRING DIAGRAM DF40T DF50T ...
Страница 272: ... _ _ r ...
Страница 279: ......
Страница 367: ... ...
Страница 369: ...99501 87J00 01E OUTBOARD MOTOR Printed in Japan TK ...
Страница 405: ...Prepared by Marine Power Products Division 1 st Ed January 1999 Manual No 99501 87J00 01E Printed in Japan 36 ...