
2-10 PERIODIC MAINTENANCE
INSTALLATION
Installation is reverse order of removal with the special attention
to the following steps.
• Tighten the four cylinder head cover bolts diagonally to the
specified torque.
Cylinder head cover bolt: 7 N·m (0.7 kg-m, 5.0 lb-ft)
• Make sure that the cylinder head cover gasket is installed cor-
rectly.
Do not re-use the removed gasket. Always use a new
gasket.
Содержание DF 25
Страница 1: ...99500 97J00 01E Printed in Japan TK K6 9 9 5 0 0 9 7 J 0 0 0 1 E ...
Страница 54: ...FUEL SYSTEM 4 9 7 Remove the needle valve C from the float 8 Remove the main jet D 9 Remove the main nozzle E ...
Страница 87: ...POWER UNIT 6 21 17 Remove a screw S and the reed valve T ...
Страница 143: ...WIRE AND HOSE ROUTING 9 1 WIRE AND HOSE ROUTING CONTENTS 9 HOSE ROUTING 9 2 WIRE ROUTING 9 3 WIRING DIAGRAM 9 4 ...
Страница 147: ...Prepared by Service Department May 2006 Manual No 99500 97J00 01E Printed in Japan 148 ...
Страница 148: ...99500 97J00 01E Printed in Japan TK K6 9 9 5 0 0 9 7 J 0 0 0 1 E ...