
7-14 MID UNIT
• Install the tiller handle washers
4
and the handle pivot bolt
5
.
• Apply the Thread Lock to the handle pivot bolt.
99000-32050: THREAD LOCK “1342”
• Tighten the tiller handle pivot bolt
5
to the specified torque.
Tiller handle pivot bolt: 17 N·m (1.7 kg-m, 12.5 lb-ft)
• Install the throttle cable
6
to the throttle cable holder
8
.
• Install the throttle cable
6
to the carburetor
7
.
• Check that the throttle control is smoothly operated from the
full closed position to the full opened position.
• Install the choke rod connector
0
to the carburetor
7
.
• Install the choke rod
9
to the choke rod connector
0
.
• Check that the choke control is smoothly operated from the
full closed position to the opened position.
Содержание DF 25
Страница 1: ...99500 97J00 01E Printed in Japan TK K6 9 9 5 0 0 9 7 J 0 0 0 1 E ...
Страница 54: ...FUEL SYSTEM 4 9 7 Remove the needle valve C from the float 8 Remove the main jet D 9 Remove the main nozzle E ...
Страница 87: ...POWER UNIT 6 21 17 Remove a screw S and the reed valve T ...
Страница 143: ...WIRE AND HOSE ROUTING 9 1 WIRE AND HOSE ROUTING CONTENTS 9 HOSE ROUTING 9 2 WIRE ROUTING 9 3 WIRING DIAGRAM 9 4 ...
Страница 147: ...Prepared by Service Department May 2006 Manual No 99500 97J00 01E Printed in Japan 148 ...
Страница 148: ...99500 97J00 01E Printed in Japan TK K6 9 9 5 0 0 9 7 J 0 0 0 1 E ...