
1-6 GENERAL INFORMATION
ENGINE BREAK-IN
The first 10 hours are critically important to ensure correct run-
ning of either a brand new motor or a motor that has been recon-
ditioned or rebuilt. How the motor is operated during this time
will have direct bearing on its life span and long-term durability.
Break-in period: 10 hours
WARM-UP RECOMMENDATION
Allow sufficient idling time (more than 5 minutes) for the engine
to warm up after cold engine starting.
THROTTLE RECOMMENDATION
NOTE:
Avoid maintaining a constant engine speed for an extended
period at any time during the engine break-in by varying the
throttle position occasionally.
1. FIRST 2 HOURS
For first 15 minutes, operate the engine in-gear at idling
speed.
During the remaining 1 hour and 45 minutes, operate the
engine in-gear at less than 1/2 (half) throttle (3 000 r/min).
NOTE:
The throttle may be briefly opened beyond the recommended
setting to plane the boat, but must be reduced to the recom-
mended setting immediately after planing.
2. NEXT 1 HOUR
Operate the engine in-gear at less than 3/4 (three-quarter)
throttle (4 000 r/min).
3. LAST 7 HOURS
Operate the engine in-gear at desired engine speed.
However, do not operate continuously at full throttle for more
than 5 minutes.
Содержание DF 25
Страница 1: ...99500 97J00 01E Printed in Japan TK K6 9 9 5 0 0 9 7 J 0 0 0 1 E ...
Страница 54: ...FUEL SYSTEM 4 9 7 Remove the needle valve C from the float 8 Remove the main jet D 9 Remove the main nozzle E ...
Страница 87: ...POWER UNIT 6 21 17 Remove a screw S and the reed valve T ...
Страница 143: ...WIRE AND HOSE ROUTING 9 1 WIRE AND HOSE ROUTING CONTENTS 9 HOSE ROUTING 9 2 WIRE ROUTING 9 3 WIRING DIAGRAM 9 4 ...
Страница 147: ...Prepared by Service Department May 2006 Manual No 99500 97J00 01E Printed in Japan 148 ...
Страница 148: ...99500 97J00 01E Printed in Japan TK K6 9 9 5 0 0 9 7 J 0 0 0 1 E ...